PLEASE SCAN HERE: ANY QUESTIONS? Scan code contact us via our customer portal.
Page 3
ACCESSING VIDEO GUIDES... ACCESSING VIDEO GUIDES... 3. Scan QR code... Some steps within this set of instructions come with an added video guide for your convenience. These can be accessed via the QR code and used to aid you in constructing that step.
Page 4
Fascia 7x60x1016mm QTY 4 suitable base ready to erect your OVLPR60-1016mm End View building 01DTOVAX0806DDFW-V2 Fixed Window Strip 12x30x546mm QTY 14 (WITH WINDOW ONLY) S1230-546mm End View 01DTOVAX0806DDNW-V2 Cover Trims 12x45x1575mm QTY 6 S1245-1575mm...
Step 1 IMPORTANT: Pre-drill before xing screws. Nail Bag PLEASE SCAN HERE: Parts needed - No. 1 QTY 1 There may be extra screws present in the nail bag No. 7 QTY 2 No. 20 QTY 4 50mm Screw x 50 30mm Screw x 153 Place the doors (No.
Page 6
Step 3 Step 2 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 2 QTY 1 Parts needed - No. 5 QTY 2 No. 3, (or 4) QTY 1 Place the oors (No.5) on a rm and level base, **Please note: Whether you have ensure the base has suitable drainage free from areas...
Page 7
Step 4 Step 5 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 3, (or 4) QTY 1 Parts needed - No. 1 QTY 1 No. 4, (or 3) QTY 1 No. 4, (or 3) QTY 1 Fix the corners of the Back Gable Fix the end of the Window Panel (No.2) and the Window Panel (No.4)
Page 8
Step 8 Step 7 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 6 QTY 4 PLEASE SCAN HERE: No. 13 QTY 4 Place the assembled ridge bar in between the Gables (No. 1&2) in line with the central Fix the eaves frames (No.13) to each roof sheet uprights within the gables.
Page 9
Step 9 Step 10 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 14 QTY 2 Parts needed - No. 16 QTY 2 Position a Truss Frame (No. 14), centrally Place Truss Block (No. 16) directly below the Truss Frame (No.
Page 10
Step 11 Step 13 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 15 QTY 1 Once the roof is xed, Place the Truss Support Brace (No. attach the building to the oor 15) underneath the two Truss with 50mm screws.
Page 11
Step 14 Step 15 IMPORTANT: Pre-drill before xing screws. For a windowless version go to step 16 Parts needed - No. 23 QTY 1 PLEASE SCAN HERE: No. 24 QTY 1 Parts needed - No. 9 QTY 14 No. 21 QTY 2 Cut the felt (No.
Page 12
Step 16 Step 18 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 10 QTY 6 Parts needed - No. 18 QTY 2 Fit the Cover Trims (No.10) over Attach the Inner Door Blocks (No. 18) to each panel join and corner of the the framing inside one of the doors (No.
Page 13
Step 20 Step 21 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 17 QTY 2 No. 27 QTY 1 Once constructed, apply a preserving treatment and a waterproo ng treatment Fix the door strips (No. 17) onto the to your garden building as soon as front of the doors (opposite door to possible.
Page 14
PLEASE SCAN HERE: ANY QUESTIONS? Scan code contact us via our customer portal.
Need help?
Do you have a question about the 01DTOVAX0806DDFW-V2 and is the answer not in the manual?
Questions and answers