PLEASE SCAN HERE: ANY QUESTIONS? Scan code contact us via our customer portal.
Page 3
ACCESSING VIDEO GUIDES... ACCESSING VIDEO GUIDES... 3. Scan QR code... Some steps within this set of instructions come with an added video guide for your convenience. These can be accessed via the QR code and used to aid you in constructing that step.
Page 4
Fascia 12x60x694mm QTY 4 suitable base ready to erect your S1260-694mm building Fixed Window Strip 12x30x546mm QTY 5 (WITH WINDOW ONLY) 01DTOVAX0604SDFW-V1 S1230-546mm 01DTOVAX0604SDNW-V1 Cover Trims 12x45x1575mm QTY 4 S1245-1575mm MADE IN GREAT BRITAIN...
Page 5
IMPORTANT: Pre-drill before xing screws. Step 2 Pre Assembly PLEASE SCAN HERE: PLEASE SCAN HERE: Parts needed - No. 1 QTY 1 Before assembling remove the transportation No. 7 QTY 1 blocks from the bottom of each panel. No. 15 QTY 3 Take care removing the blocks as to not damage Place the door (No.
Page 6
Step 4 Step 3 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 1 QTY 1 Parts needed - No. 2 QTY 1 No. 4, (or 3) QTY 1 No. 3, (or 4) QTY 1 Fix the end of the Window Panel (No.4) (or Fix the corners of the Back Gable (No.2) Plain Panel) to the corner of the Back Gable...
Page 7
Step 6 Step 7 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 6 QTY 2 No. 13 QTY 4 Use 40mm screws to x the roof sheets (No. 6) down the sides and at the bottom Fix the eaves frames (No.13) to each being sure that the screws attach into the roof sheet (No.6) using 3x30mm screws...
Page 8
Step 10 Step 9 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 10 Parts needed - No. 18 QTY 1 Fit the Cover Trims (No.10) to the front and back Cut the felt (No.18) into 2 sheets at of the building as shown in the illustration using 1900mm (L) x 1000mm (W) and lay onto 30mm screws.
Page 9
Step 12 Step 13 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. For a windowless version go to step 12 Parts needed - No. 11 QTY 2 PLEASE SCAN HERE: Parts needed - No. 9 QTY 5 Use 4x30mm Screws to x each beading No.
Page 10
Step 14 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 21 QTY 1 To x the lock in place. Screw the Staple (No. 21) to the Door Gable making sure that the screws go into the framing behind. It is ESSENTIAL that you apply wood treatment immediately after the building Check the Hasp (No.
Page 11
PLEASE SCAN HERE: ANY QUESTIONS? Scan code contact us via our customer portal.
Need help?
Do you have a question about the 01DTOVAX0604SDFW-V1 and is the answer not in the manual?
Questions and answers