Download Print this page

Advertisement

Quick Links

x2
7X5 OVERLAP APEX SHED
2mm Drill bit

Advertisement

loading
Need help?

Need help?

Do you have a question about the 01DTOVAX0705SDFW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 01DTOVAX0705SDFW-V1

  • Page 1 7X5 OVERLAP APEX SHED 2mm Drill bit...
  • Page 3 Fascia 12x60x851mm QTY 4 suitable base ready to erect your S1260-851mm building Fixed Window Strip 12x30x546mm QTY 5 (WITH WINDOW ONLY) S1230-546mm 01DTOVAX0705SDFW-V1 Cover Trims 12x45x1575mm QTY 4 S1245-1575mm 01DTOVAX0705SDNW-V1 Door Beading Strip 12x28x1590mm QTY 2 MADE IN GREAT BRITAIN...
  • Page 4 Step 2 IMPORTANT: Pre-drill before xing screws. Pre Assembly Parts needed - No. 1 QTY 1 Before assembling remove the transportation No. 7 QTY 1 blocks from the bottom of each panel. No. 15 QTY 3 Take care removing the blocks as to not damage Place the door (No.
  • Page 5 Step 3 Step 4 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 2 QTY 1 Parts needed - No. 1 QTY 1 No. 3, (or 4) QTY 1 No. 4, (or 3) QTY 1 Fix the corners of the Back Gable (No.2) and Fix the end of the Window Panel (No.4) the Plain Panel (No.3) (or Window Panel)
  • Page 6 Step 5 Step 6 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 12 QTY 1 Parts needed - No. 6 QTY 2 No. 20 QTY 1 No. 13 QTY 2 Place the ridge bar (No.12) in between Fix the eaves frames (No.13) to the Door Gable (No.1) and Back Gable each roof sheet (No.6) using...
  • Page 7 Step 7 Step 8 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 18 QTY 1 Once the roof is xed attach the building to the oor Cut the felt (No.18) into 2 sheets measuring with 50mm screws. Make sure 2230mm (L) x 1000mm (W) and lay onto the that you screw into the buildingin the order shown in the diagram,...
  • Page 8 Step 9 Step 11 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 10 For a windowless version go to step 12 Fit the Cover Trims (No.10) to the front Parts needed - No. 9 QTY 5 and back of the building as shown in the No.
  • Page 9 Step 13 Step 12 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 11 QTY 2 Parts needed - No. 21 QTY 1 To x the lock in place. Screw the Staple Use 4x30mm Screws to x each (No.
  • Page 10: After Treatment

    It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled. AFTER TREATMENT: score around protective cover on glazing and carefuly peel covering back...

This manual is also suitable for:

01dtovax0705sdnw-v1