Page 3
Depth = 1537mm Depth = 1456mm Height = 2321mm Height = 2321mm Pack Requirements: Pack Requirements: 01DTOVAX10DDNWGP-V1 QTY 1 01DTOVAX10DDNWGP-V1 QTY 1 01DTOVAX0510FWPB-V1 QTY 1 MADE IN GREAT BRITAIN 01DTOVAX0510NWPB-V1 QTY 1 5X10 Apex With Windows 5X10 Apex No Windows...
Page 4
Building Contents- Gable Pack 01DTOVAX10DDNWGP-V1 Fascias 12x56x1671mm QTY 4 S1256-1671mm Cover Trim 12x45x1542mm QTY 5 S1245-1542mm Back Gable Top Right QTY 1 AI-R11OVHAGTR692X1461-V1 Back Gable Cover Strip 7x125x2090mm QTY 1 OVLP7125-2090mm Front Gable Cover Strip 7x125x1876mm QTY 1 OVLP7125-P-1876mm Back Gable Top Left QTY 1...
Pre Assembly Step 2 IMPORTANT: Pre-drill before xing screws. Building Size Parts Needed All Sizes Before assembling remove the transportation No.18 QTY 1 blocks from the bottom of each panel. 40mm Screws QTY 6 Take care removing the blocks as to not damage Lay the Front Gable Cover Strip (No.18) onto the panels.
Page 7
Step 4 Step 6 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Building Size Building Size Parts Needed 5x10 15x10 10x10 20x10 All Sizes Parts Needed QTY 2 QTY 4 QTY 6 QTY 8 No.27 QTY 10 50mm Screws QTY 4 QTY 12 QTY 16...
Page 8
Step 7 Step 8 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. *For 5x10 Buildings, please move onto Step 8 Building Size *Please note: Whether you have purchased the with windows Building Size Parts Needed All Sizes building or no windows building, the Window panel and plain panel 10x10 15x10 20x10...
Page 9
Step 10 IMPORTANT: Pre-drill before xing screws. Step 11 IMPORTANT: Pre-drill before xing screws. *For 5x10 Buildings, please move onto Step 11 Building Size Building Size Parts Needed All Sizes Parts Needed 10x10 15x10 20x10 QTY 8 50mm Screws QTY 1 QTY 2 QTY 3 No.7...
Page 10
Step 13 Step 14 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. *For 5x10 Buildings, please move onto Step 16 Building Size Building Size Parts Needed 10x10 15x10 20x10 Parts Needed 10x10 15x10 20x10 QTY 1 QTY 2 QTY 3 No.32 QTY 2...
Page 11
Step 15 Step 17 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. *For 5x10 Buildings, please move onto Step 16 Building Size Building Size Parts Needed 5x10 Only Parts Needed 10x10 15x10 20x10 QTY 4 QTY 2 QTY 2 30mm Screws QTY 2 No.21...
Page 12
Step 18 Step 19 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Building Size Building Size Parts Needed 10x10 15x10 20x10 Parts Needed 5x10 10x10 15x10 20x10 10x10 QTY 2 QTY 4 QTY 6 QTY 2 QTY 4 QTY 6 QTY 8 No.30...
Page 13
Step 21 Step 20 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. *For 5x10 Buildings, please move onto Step 22 Building Size Building Size 10x10 Parts Needed 5x10 10x10 15x10 20x10 Parts Needed 5x10 10x10 15x10 20x10 QTY 2 QTY 4 QTY 6 QTY 8...
Page 14
Step 22 Step 23 IMPORTANT: Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. Building Size Building Size- Window Pack Only Parts Needed 5x10 10x10 15x10 20x10 Parts Needed 5x10 10x10 15x10 20x10 QTY 20 QTY 28 QTY 36 QTY 44 QTY 5 50mm Screws...
Page 15
Step 24 Step 25 IMPORTANT : Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. Building Size Building Size Parts Needed All Sizes Parts Needed All Sizes QTY 2 No.5 QTY 4 No.12 No.20 QTY 6 No.19 QTY 2 30mm Screws QTY 42 No.22...
Page 16
Step 26 5x10 Building Size 1570mm (L) X 1000mm (W) Parts Needed 5x10 10x10 15x10 20x10 10x10 1570mm 3050mm 4520mm 5990mm No.25-Size Required Felt Tacks QTY 75 QTY 150 QTY 225 QTY 300 3050mm (L) X 1000mm (W) Cut four strips of felt (No.25) to the dimensions stated for your building size and place onto the roof.
Page 17
Step 27 Step 28 IMPORTANT : Pre-drill before xing screws. Building Size Building Size Parts Needed All Sizes Parts Needed 5x10 10x10 15x10 20x10 QTY 1 No.9 QTY 7 QTY 9 QTY 11 No.16 QTY 5 10x10 No.10 QTY 1 QTY 21 QTY 27 QTY 33...
Page 18
Step 29 Step 31 IMPORTANT : Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. Building Size Building Size All Sizes Parts Needed Parts Needed All Sizes No.11 QTY 1 QTY 4 No.15 30mm Screws QTY 3 No.23 QTY 2 Locate the Back cover trim (No.11) 40mm Screws QTY 16...
Need help?
Do you have a question about the 01DTOVAX10DDNWGP-V1 and is the answer not in the manual?
Questions and answers