Download Print this page

Mercia Garden Products 01DTOVPN0705SDFW-V2 Assembly Instructions Manual

Advertisement

Quick Links

x2
DIP TREATED OVERLAP PENT 7X5 SINGLE DOOR FIXED WINDOW
2mm Drill bit

Advertisement

loading
Need help?

Need help?

Do you have a question about the 01DTOVPN0705SDFW-V2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 01DTOVPN0705SDFW-V2

  • Page 1 DIP TREATED OVERLAP PENT 7X5 SINGLE DOOR FIXED WINDOW 2mm Drill bit...
  • Page 3 Before assembly please make sure you have a Ridge Bar - 27x44x1410mm QTY 1 suitable base ready to erect your F2744-1410mm building Eaves Frame - 28x28x1055mm QTY 2 F2828-1055mm Door Block - 28x28x140mm QTY 1 F2828-140mm MADE IN GREAT BRITAIN Front Fascia - 12x60x1067mm QTY 2 S1260-1067mm Overall Dimensions:...
  • Page 4: Pre-Assembly

    Step 2 Pre Assembly IMPORTANT: Pre-drill before xing screws. Parts needed - No. 1 QTY 1 No. 9 QTY 1 Before assembling remove the transportation No. 21 QTY 3 blocks from the bottom of each panel. Place the door (No.9) within the Door Take care removing the blocks as to not damage Panel (No.
  • Page 5 Step 3 Step 5 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No.4 QTY 1 Parts Needed - No.1 QTY 1 - No.5 QTY 1 - No.3 QTY 1 Place the Plain panel 1 (No.5) and the Left Place the Right Gable (No.3) and the Gable (No.4) onto the oor.
  • Page 6 Step 7 IMPORTANT: Pre-drill before xing screws. Step 9 Parts Needed - No.8 QTY 1 Parts Needed - No.24 QTY 1 - No.11 QTY 2 Cut the felt (No.24) into 2 sheets at Fix the eaves frame (No.11) to 2210mm (L) x 1000mm (W) and lay the roof sheet (No.8) using onto the roof as shown in diagram 3x30mm screws for each sheet.
  • Page 7 Step 10 Step 11 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No.18 QTY 2 Parts Needed - No.15 QTY 3 - No.19 QTY 1 - No.16 QTY 3 - No.20 QTY 2 Fix the cover trims (No.15 and - No.25 QTY 1 No.16) to each corner and join, - No.26 QTY 1...
  • Page 8: After Treatment

    Step 13 IMPORTANT: Pre-drill before xing screws. Parts Needed - No.12 QTY 1 - No.17 QTY 2 Fix the Door beading strips (No.17) to the inside of the door panel framing, secure using 4x30mm screws. Fix the Door Block (No.12) onto the inside of the door in line with the door framing as shown, secure using 2x30mm screws through the door...