CONSTRUCTION
All metallic components of the machine in direct contact with drinking water
are manufactured from high quality 316 and 304 grade stainless steel or
non-ferrous materials providing maximum resistance to corrosion.
INSTALLATION AND MAINTENANCE
LOCATION
The boiler must be installed in a location where access is restricted to
operators who are suitably trained, or where untrained operators of the
machine can be supervised by trained personnel.
The maximum and minimum ambient operating conditions must be
between 35°C and 5°C. The appliance is not suitable for installation
where a water jet could be used. Install the boiler on a surface suitable
for the working weight of the boiler. Allow clearance for ventilation and
for the easy removal of the front panel and drain access plate. Calomax
recommend a minimum clearance of 50mm on all sides of the boiler. A
suitably qualified engineer must install this unit. Plumbing and electrical
installation work may be involved.
Page 4
The tap handle has been treated with an
antimicrobial additive and independently tested.
To comply with recommendations from the Health and
Safety Executive it is important that due consideration be
given to safe operation of the controls of the boiler. The
boiler should therefore be mounted in such a manner
that the operator can stand directly facing the machine
with the controls at a recommended height from the
floor to the draw-off tap handle of 1200mm +/- 100mm.
Consideration should also be given to the servicing
requirements of the machine.
Need help?
Do you have a question about the ECLIPSE HS3C10 and is the answer not in the manual?