Construction; Installation; Location; Cold Water Inlet - Calomax eclipse 3C5 Installation, Operation And Servicing Instructions

Table of Contents

Advertisement

Calomax products have been tested and found to comply
with the requirements of the Water Supply (Water Fittings)
Applied for
Regulations 1999 for England and Wales Water Bylaws
2000, Scotland and the Water Regulations Ireland.

CONSTRUCTION

All metallic components of the machine, in direct contact with
drinking water are manufactured from high quality 304 grade
stainless steel, or non ferrous materials, providing maximum
resistance to corrosion.
INSTALLATION AND MAINTENANCE

LOCATION

The boiler must be installed in a location where access is
restricted to operators that are suitably trained, or where
untrained operators of the machine can be supervised by trained
personnel.
To comply with recommendations
from the Health and Safety Executive
it is important that due consideration
be given to safe operation of the
controls of the boiler. The boiler should
therefore be mounted in such a manner
that the operator can stand directly
facing the machine with the controls at
a recommended height from the fl oor to
the draw-off tap handle of 1200mm +/-
100mm. Consideration should also be
given to the servicing requirements of the machine. The maximum
and minimum ambient operating conditions must be between
5 °C and 35 °C. The appliance is not suitable for installation where
a water jet could be used. Install the boiler on a surface or wall
suitable for the working weight of the boiler. Allow clearance for
ventilation and for the easy removal of the outer casing lid and
Page 4
front panel. Calomax ltd recommend a minimum clearance of
50mm on all sides of the boiler. A suitably qualifi ed engineer must
install this unit. Plumbing and electrical installation work may be
involved.
3 point fi xing wall
bracket for wall
mounted range
Hang the boiler on the wall bracket and secure into place with
4th fi xing. The electrical cable should be routed as shown

COLD WATER INLET

To comply with the U.K. Water Supply Regulation a single check-
valve must be fi tted to the supply. BEFORE CONNECTING, THE
SUPPLY PIPE MUST BE THOROUGHLY FLUSHED OUT TO
ENSURE THAT FOREIGN MATTER DOES NOT BLOCK OR
ENTER THE SOLENOID VALVE
The boiler must be connected to a potable water supply using
the food grade hose where provided, or rigid 15mm pipe in
a manner which complies with UK water regulations via an
appropriate isolating valve. The supply must provide a constant
pressure of between 20 KPa and 1000 KPa (0.2 to 10 Bar).
If the water supply contains excessive solids in suspension it is
recommended that a fi ne mesh "in line" water fi lter is fi tted in the
pipe work. Failures due to scale and sediment are not covered by
the warranty.
Cold water
Vent &
inlet
overfl ow
Page 5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eclipse 3w5Eclipse 3c10

Table of Contents