2. PLANNING THE 2.3 Installation Location INSTALLATION To comply with recommendations from the health and safety executive it is important that due consideration All installation and maintenance work must be be given to the safe operation of the controls of the carried out by competent persons boiler.
Fig 5. Figure 6. shows the approximate times for boiling water to be available at the draw off tap, from commissioning. These times will vary depending on the water pressure of the mains water supply. Fig 6. Model Approximate times for boiling water to be available, from commissioning 18 mins 7.5L...
6. MAINTENANCE Scale deposits should be removed from all internal surfaces, particularly the heating element, thermistor Competent persons must carry out all maintenance pocket etc. by gently tapping or scrapping. If the deposits work. are soft, use a nylon pad and flush out. Abrasive cleaning When the body lid has been removed , It is materials containing scouring powders and detergents recommended that a new body lid gasket be fitted on...
Page 10
The overflow screen can be cleaned or replaced indicator is flashing with a new part (supplied by Calomax) as required. ED’s fitted to the Main PCB indicate the operation of the solenoid and element. The red LED indicates that the element should be energized and the yellow LED 6.7 Adjusting the Water Temperature Set Point...
Page 11
WIRING DIAGRAM FOR CLIPPER2 WATER BOILERS (using v10 pcb board ) WIRING DIAGRAM FOR CLIPPER2 WATER BOILERS (using v11 pcb board ) PAGE 9 ISSUE 17...