CONSTRUCTION

All metalic components of the machine, in direct contact with drinking
water are manufactured from high quality 304 grade stainless steel, or
non ferrous materials, providing maximum resistance to corrosion.

LOCATION

The boiler must be installed in a location where access is restricted to
operators that are suitably trained, or where untrained operators of the
machine can be supervised by trained personnel.
must be between 5 °C and 35 °C. The appliance is not suitable for
installation where a water jet could be used. Install the boiler on a
surface suitable for near boiling temperatures and the working weight
of the boiler. Allow adequate clearance for ventiation and for the easy
removal of the outer casing lid and left hand side panel panel. Calomax
ltd recommend a minimum clearance of 50mm on all sides of the boiler
except the left hand side which requires minimum fo 150 mm clearance
for maintenance. A suitably qualified engineer must install this unit.
Plumbing and electrical installation work is involved.

COLD WATER INLET

To comply with the U.K. Water Supply Regulation a single check-valve
must be fitted to the supply.
Page 4

INSTALLATION

To comply with recommendations from the
health and safety executive it is important
that due consideration be given to safe
operation of the controls of the boiler.
The boiler should therefore be mounted
in such a manner that the operator can
stand directly facing the machine with the
controls at a recommended height from the
floor to the draw-off tap handle of 1200mm
+/- 100mm. Consideration should also
be given to the servicing requirements
of the machine. The maximum and
minimum ambient operating conditions

Hide quick links: