Download Print this page

Salicru SLC X-TRA Series Installation Manual page 3

500 and 800 kva
Hide thumbs Also See for SLC X-TRA Series:

Advertisement

General index
1.
Introduction.
1.1.
Acknowledgement letter.
2.
Information for safety.
2.1.
Using this manual.
2.1.1.
Conventions and used symbols.
3.
Quality and standard guarantee.
3.1.
Declaration of the management.
3.2.
Standard.
3.2.1. First and second environment.
3.2.1.1. First environment.
3.2.1.2. Second environment.
3.3.
Environment.
4.
Installation.
4.1.
Important safety instructions.
4.1.1.
Safety instructions regarding to batteries.
4.1.2. Transport and handling.
4.1.3. Installation.
4.1.4.
Electrical connection.
4.1.5. Operating.
4.1.6.
Maintenance.
4.1.7.
Storage.
4.2.
To keep in mind.
4.3.
General views
4.4.
Reception of the equipment.
4.4.1.
Assembly procedure for 500 and 800 kVA
4.4.2. Location and minimum distances for UPS cooling.
4.4.3. Footprint and weights.
4.4.3.1. Minimum distances from the walls and ventilation
4.4.4. Heat losses
4.4.5. Dimensions.
4.4.6. Environment conditions of the installation.
4.5.
Electrical connection.
4.5.1. Connection.
4.5.2. Backfeed protection device
4.5.3. Terminal boards
4.5.4. Connection of the output (to loads).
4.5.5. Connection of batteries (cabinet or rack).
4.5.6. Connection of main input earth terminal
(
)
terminal
.
4.5.7. Connection of the auxiliary contact terminal strip.
4.5.7.1. Diesel generator (DIESEL MODE)
4.5.7.2. Battery auxiliary contact.
4.5.7.3. Output emergency shutdown (EPO).
4.5.7.4. Auxiliary contact of the output switch.
4.5.8. Interfaces.
4.5.9. Connection of dry contacts card (Option).
5.
Annexes.
5.1.
General technical specifications.
5.2.
Glossary
SALICRU
(
)
and the earth bonding
3

Advertisement

loading
Need help?

Need help?

Do you have a question about the SLC X-TRA Series and is the answer not in the manual?

Subscribe to Our Youtube Channel