4.3 Bill of Materials (BOM)
Designator
Quantity
C1, C2, C3, C4
4
C5, C6, C7, C8,
8
C24, C25, C26, C27
C9, C10, C11, C12,
16
C17, C18, C19,
C20, C28, C29,
C30, C31, C35,
C36, C37, C38
C13, C32
2
C14, C22, C33
3
C15
1
C16, C34
2
C21
1
C23
1
C39
1
FID1, FID2, FID3
3
H1, H2, H3, H4
4
H5, H6, H7, H8
4
J1
1
J2
1
J3, J4
2
J5
1
L1
1
LBL1
1
SLVUCT1 – APRIL 2024
Submit Document Feedback
Table 4-1. Bill of Materials
Value
Description
2.2uF
CAP, CERM, 2.2uF, 50V, +/- 10%, X7R, AEC-
Q200 Grade 1, 0805
10µF
Chip Multilayer Ceramic Capacitors for
General Purpose, 0805, 10uF, X5R, 15%,
20%, 50V
22uF
CAP, CERM, 22µF, 16V,+/- 10%, X7R, AEC-
Q200 Grade 1, 1210
1uF
CAP, CERM, 1uF, 25V, +/- 10%, X7R, AEC-
Q200 Grade 1, 0603
100nF
0.1µF ±10% 16V Ceramic Capacitor X7R
0402 (1005 Metric)
10pF
CAP, CERM, 10pF, 50V, +/- 5%, C0G/NP0,
AEC-Q200 Grade 1, 0402
1uF
CAP, CERM, 1uF, 16V, +/- 20%, X7R, AEC-
Q200 Grade 1, 0603
10pF
CAP, CERM, 10pF, 50V,+/- 1%, C0G/NP0,
0402
2200pF
CAP, CERM, 2200pF, 50V, +/- 10%, X7R,
0402
100uF
CAP, AL, 100µF, 50V, +/- 20%, SMD
Fiducial mark. There is nothing to buy or
mount.
Machine Screw, Round, #4-40 x 1/4, Nylon,
Philips panhead
Standoff, Hex, 0.5"L #4-40 Nylon
TERM BLOCK 2POS 5mm, TH
Header, 100mil, 2x1, Gold, TH
Standard Banana Jack, Uninsulated, 15A
Header, 100mil, 3x1, Gold, TH
Inductor, Shielded, Composite, 1.0H, 16.9A,
0.0084 ohm, AEC-Q200 Grade 1
Thermal Transfer Printable Labels, 0.650" W
x 0.200" H - 10,000 per roll
Copyright © 2024 Texas Instruments Incorporated
Package Reference
Part Number
0805
CGA4J3X7R1H225K125AB
0805
GRM21BR61H106ME43L
1210
CL32B226KOJVPNE
0603
GCM188R71E105KA64D
0402
ATC530L104KT16T
0402
CGA2B2C0G1H100D050BA
0603
GCM188R71C105MA64D
0402
GRM1555C1H100FA01D
0402
GRM155R71H222KA01D
D8xL10.5mm
865060653010
N/A
N/A
Screw
NY PMS 440 0025 PH
Standoff
1902C
10x10x8.1 mm
1729018
Sullins 100mil, 1x2, 230 mil
PBC02SAAN
above insulator
Banana Jack
108-0740-001
PBC03SAAN
PBC03SAAN
SMT_5MM28_5MM48
XEL5030-102MEB
PCB Label 0.650 x 0.200 inch THT-14-423-10
TPSM64406 4-Phase, 36V, Single 12A Output, Synchronous, Buck Module Evaluation Module
Hardware Design Files
Manufacturer
TDK
Murata
Samsung Electro-
Mechanics
MuRata
American Technical
Ceramics
TDK
MuRata
MuRata
MuRata
Wurth Elektronik
N/A
B&F Fastener Supply
Keystone
Phoenix Contact
Sullins Connector
Solutions
Cinch Connectivity
Sullins Connector
Solutions
Coilcraft
Brady
17
Need help?
Do you have a question about the TPSM64406EVM-4PH and is the answer not in the manual?