Tiso PHANTOM-S Series Instruction Manual

Tiso PHANTOM-S Series Instruction Manual

Waist-high turnstiles

Advertisement

Quick Links

1
"TISO-PRODUCTION" LTD
WAIST-HIGH TURNSTILES
PHANTOM-S of optical lane of Speed Gate series
OPERATION AND INSTALLATION MANUAL
2023
AUIA.210-03
rev.1.1
UKRAINE

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PHANTOM-S Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Tiso PHANTOM-S Series

  • Page 1 “TISO-PRODUCTION” LTD WAIST-HIGH TURNSTILES PHANTOM-S of optical lane of Speed Gate series OPERATION AND INSTALLATION MANUAL 2023 AUIA.210-03 rev.1.1 UKRAINE...
  • Page 2: Table Of Contents

    CONTENTS INTRODUCTION ................................3 WARNINGS TO THE CUSTOMER ON SAFE OPERATION OF THE TURNSTILE ..........4 1. DESCRIPTION AND OPERATION ........................... 5 1.1 General Information and Purpose..........................5 1.2 Specifications ................................7 1.3 Configuration and Scope of Delivery ........................7 1.4 Design and operation ..............................
  • Page 3: Introduction

    INTRODUCTION This Operation Manual (hereinafter referred to as OM) covers the optical "PHANTOM-S" type waist-high turnstile (hereinafter referred to as the "turnstile"). The Operation Manual contains information about design, specifications, installation for proper operation and maintenance of the turnstile. This Operation Manual is prepared in compliance with the specification requirements ТU U 28.9-32421280-005:2018. The turnstile shall be serviced only by the qualified staff having the relevant class of permit to work with electrical facilities with voltage up to 1000V and scrutinizing this Operation Manual, obtaining safety instructions and trained for operation and maintenance of the turnstile.
  • Page 4: Warnings To The Customer On Safe Operation Of The Turnstile

    WARNINGS TO THE CUSTOMER ON SAFE OPERATION OF THE TURNSTILE These warnings are designed for ensuring of safety during operation of the turnstile to prevent violation of safety characteristics by improper installation or operation. These warnings are aimed at drawing attention of the customer to safety problems GENERAL WARNINGS The Operation Manual is an integral part of the product and it shall be handed over to the customer.
  • Page 5: Description And Operation

    1. DESCRIPTION AND OPERATION 1.1 General Information and Purpose 1.1.1 Turnstile purpose: The optical turnstile is designed for pedestrian movement control at access points of industrial enterprises, banks, stadiums, administrative facilities etc. controlled by access control system (from proximity card readers) or manually (from manual control panel).
  • Page 6 1.1.3 The turnstile component identification codes are specified in Table 2. Table 2 - Overall dimensions of pedestal Dimensions, mm Max. Description of the turnstile component Order code weight, kg Н В One side cabinet Master PHANTOM-S-1.1 Т3.КСD.XD One side cabinet Slave PHANTOM-S-1.2 1014 1004 Double side cabinet Master/Slave PHANTOM-S-2...
  • Page 7: Specifications

    1.2 Specifications Key parameters of the turnstile are specified in Table 4. Table 4 Parameter description Parameter value 550-1000 mm Maximum lane width ~ 60 man/min. Traffic flow capacity in the single access mode, at least ≥ 60 man/min. Traffic flow capacity in free access mode, at least Power supply voltage: 100 ...
  • Page 8: Design And Operation

    1.3.3 Design of the "Phantom-S-2" type turnstile The turnstile is one double sided or more auxiliary cabinets " Phantom-S-2" (Master/Slave), (See Fig. 4). The number of auxiliary cabinets to be specified in the order. The turnstile "Phantom-S-2" is used within group of the turnstile "...
  • Page 9 1 – side door (with control panel); 2 – end panel; 3 – LED display  ( Top DotLights ® Front DotLights 4 – place for identification card reader with LED  (RFIDLights 5 – top lid (solid glass); 6 – top lining ; 7 –...
  • Page 10 1.4.3 Principle of operation Fig.6 – Light indication of the turnstile status Access cycle: Standby mode 1. In the initial state blue LED is lit. 2. The turnstile is opened for access in the direction "А" or "В" after the appropriate command from ACS or control desk is issued. 3.
  • Page 11: Description And Operation Of Controlers As Integral Components Of The Turnstile

    1.5 Description and operation of controlers as integral components of the turnstile 1.5.1 Turnstile controller AUIA.206.21.20.00 1.5.1.1 Appearance of controller AUIA.206.21.20.00 is shown in Figure 8. 1.5.1.2 Description of operation The controller provides algorithm of operation of the whole turnstile. It is assembled on the card from foil-clad textile laminate of 120 х...
  • Page 12 1 - ON - when command is generated the turnstile will be opened for 5 seconds; OFF - when command is generated the turnstile will be opened for the time set by ACS; 2 - ON- the state of outputs OUT1-5 will be NC; - OFF - the state of outputs OUT1-5 will be NO;...
  • Page 13 Table 6 Connector/ Signal parameters and Designation Direction Purpose Contact No description 1) logical «0» (0  2,2) V; INP1 ХТ4/1 ENTRY 2) logical «1» (3  5) V; ("TO BE OPENED A") "TO BE OPENED FOR INP2 3) active level of signal SINGLE/FREE ACCESS"...
  • Page 14: Intended Use

    2 INTENDED USE 2.1 Operation restrictions 2.1.1 The turnstile must be used in the environment specified in p. 1.1.4 of this document subject to the specifications listed in section 1.2. IT IS FORBIDDEN: to misuse the turnstile (see section 1 "description and operation"); to use the turnstile unearthed;...
  • Page 15 2.2.5 Total configuration of the "PHANTOM-S " turnstile access ways Fig. 10 – The "Phantom -S " turnstile access way arrangement options WARNING: The damages occurred during the turnstile transportation are not covered by the manufacturer's warranty liability.
  • Page 16: Installation Procedure

    2.3 Installation procedure. The turnstile installation procedure is as follows: 1) Damages to be fixed (picture to be taken, damage report to be made). 2) The turnstiled to be unpacked and inspected for defects and damages as well as completeness to be checked according to the turnstile data sheet;...
  • Page 17 6) The relevant holes to be drilled on the surface according to the marking due to diameter of anchors (12×120М10) for the turnstile fixation included in the scope of delivery. 7) Anchor jackets to be inserted into the prepared holes. 8) The following cables to be run to the turnstile installation site: ...
  • Page 18 Option 1 Option 2 Fig. 14 – Options of cable connection between cabinets Master and Slave...
  • Page 19 11) The turnstile to be installed upright at the prepared location. To provide access to fixation holes and terminal blocks from both sides of cabinet it is required to 1 The side door to be opened with allen key (see Fig.15); 2 the solid glass top lid to be removed (see more paragraph 12);...
  • Page 20 13) Turnstile connection: a) Power supply cable ~220 V to be connected (Fig.17): - Phase L to be connected to the circuit breaker; - Neutral (N) to be connected to terminal ~220V(N); - Earth (РЕ) to be connected to earthing terminal (РЕ). b) Control desk link cable to be connected to terminals (Fig.18): - P (Power) –...
  • Page 21: Preparation For Use

    2.4 Preparation for use 2.4.1 Commissioning guidelines Prior to the turnstile energization: 1) make sure of proper connection and good condition of all connecting cables; When mains cable of power supply unit is connected to the network the turnstile operating mechanism is energized.
  • Page 22: Contingency Actions

    Сontinuation of table 7 "PANIC" button to be 11. Activation of "panic" Green arrows of authorized free access in pushed and hold within mode both directions are lit at least 7 sec.** 12 Deactivation of Blue LED brightness is changed. "PANIC"...
  • Page 23: Maintenance

    3 MAINTENANCE 3.1 General guidelines 3.1.1 Commissioning and subsequent maintenance of the turnstile to be performed only by the staff to be in charge of the turnstile. 3.1.2 The turnstile to be serviced only by the staff having the relevant electrical safety qualification level according to the national requirements.
  • Page 24: Routine Maintenance

    4 ROUTINE MAINTENANCE 4.1 General guidelines Minor malfunctions of the turnstile are listed in Table 9 and to be remedied by the customer. More complicated malfunctions to be remedied by the manufacturer’s representative. IMPORTANT: INSPECTION, CLEANING, REPAIR OF THE TURNSTILE COMPONENTS TO BE PERFORMED ONLY AFTER THE TURNSTILE DEENERGIZATION! 4.2 Possible malfunctions Possible malfunctions of the turnstile and their remedies are listed in Table 9.
  • Page 25: Transportation And Storage

    5 TRANSPORTATION AND STORAGE 5.1 Turnstile storage It is forbidden to subject the turnstile to jerks and impacts during storage. Transportation trolleys to be used for handling of the turnstile. In storage facilities there should not be aggressive gases and vapours causing metal corrosion. Air temperature during storage should not be below +5 °С...
  • Page 26: Annex А1. Overall Dimensions Of The "Phantom-S-1" And "Phantom-S-2" Type Turnstile

    Annex А1. Overall dimensions of the “Phantom-S-1” and “Phantom-S-2” type turnstile Figure А.1 – Installation dimensions of group of the turnstiles Phantom-S...
  • Page 27: Annex B. Control Desk And Connection Diagram

    Annex B. Control desk and connection diagram 1 – control panel body; 5 – "FREE ACCESS" mode control button 2 – "SINGLE ACCESS" mode control button 6 – "PANIC" mode control button 3 – front plate; 7 – access direction LED display; 4 –...
  • Page 28 Continued Annex B. Control panel and connection diagram Fig. B.2 – Connection diagram of control panel AUIA.114.02.00.00...
  • Page 29: Annex C.1. Wiring Diagram Of The Phantom-S 1.1 Master (Auia.210-03) Rev 0.8

    Annex C.1. Wiring diagram of the Phantom-S 1.1 Master (AUIA.210-03) rev 0.8...
  • Page 30: Annex C.2. Wiring Diagram Of The Phantom-S 1.2 Slave (Auia.210-03) Rev 0.8

    Annex C.2. Wiring diagram of the Phantom-S 1.2 Slave (AUIA.210-03) rev 0.8...
  • Page 31: Annex C.3. Wiring Diagram Of The "Phantom-S-2" Master/Slave (Auia.210-03) Rev 0.8

    Annex C.3. Wiring diagram of the "Phantom-S-2" Master/Slave (AUIA.210-03) rev 0.8...
  • Page 32: Annex D.1. Diagram Of The Turnstile Connection To Access Control System (Acs)

    Annex D.1. Diagram of the turnstile connection to access control system (ACS) Relay 1 Relay 2 Door contact 1 Door contact 2 inp1 - "TO BE OPENED A" in pulse mode. When command is issued entry is activated for 5 sec. inp2- "TO BE OPENED B"...
  • Page 33: Annex D.2. Diagram Of The Turnstile Connection To Access Control System (Acs)

    Annex D.2. Diagram of the turnstile connection to access control system (ACS) inp1- " TO BE OPENED A" in pulse mode. When command is issued the input is activated for 5 sec. . inp - 2 " TO BE OPENED B" in pulse mode. When command is issued the input is activated for 5 seconds.
  • Page 34: Annex D.3. Diagram Of The Turnstile Connection To Fire Alarm (Fa)

    Annex D.3. Diagram of the turnstile connection to fire alarm (FA) inp1- " TO BE OPENED A" in pulse mode. When command is issued the input is activated for 5 sec. inp - 2 " TO BE OPENED B" in pulse mode. When command is issued the input is activated for 5 seconds.
  • Page 35: Annex D.4. Diagram Of The Turnstile Connection To Control Panel

    Annex D.4. Diagram of the turnstile connection to control panel 5 4 3 2 1...
  • Page 36 Manufacturer: LLC TiSO-PRODUCTION 14, Promyslova Street, Kyiv, 02088, Ukraine Phone: +38 (044) 291-21-11 Tel./fax: +38 (044) 291-21-02 E-mail: sales@tiso.global www.tiso.global SERVICE CENTER e-mail: service1@tiso.global Our equipment meets the requirements of European standards: EN ISO 12100:2010, EN ISO 14118:2018, EN 60204-1:2018, EN ISO 13857:2019,EN 61000-6-1:2007, EN 61000-6-3:2007/A1:2011/AC:2012 and meets the requirements of the following EU Directives: 2014/30/EU;...