3
CHECKLIST
IMPORTANT: With the pump removed from its packaging check for any damage
prior to installation. If any damage is found contact Stuart Turner Ltd within
24 hours of receipt.
Note:
ITEM DESCRIPTION
A
Pump
B
Hose
Additional parts required, not supplied:
Verifiable Double Check valve
Full bore isolation valves
Full bore isolation valves
B
A
This image is for reference only.
Figure 1
QTY NOTES
1
2
1
2
3
5
Not mandatory for
installation
(see sec 6 pipework
connections)
If not fitting by-pass
circuit.
If fitting by-pass
circuit.
Need help?
Do you have a question about the STORMBOOST and is the answer not in the manual?
Questions and answers