Table Of Contents - GEZE MCRdrive Installation And Service Instructions Manual

Profile system and drive system
Table of Contents

Advertisement

GEZE MCRdrive
Contents
1
Introduction .......................................................................................................................................................................... 4
1.1
Symbols and illustrations ................................................................................................................................................ 4
1.2
Reference documents ....................................................................................................................................................... 4
2
Basic safety notes ................................................................................................................................................................ 5
2.1
Intended use ......................................................................................................................................................................... 5
2.2
Safety-conscious working ............................................................................................................................................... 5
2.3
Environmentally conscious working........................................................................................................................... 5
3
Product overview ................................................................................................................................................................ 6
4
Installation ............................................................................................................................................................................. 7
4.1
Tools and aids required .................................................................................................................................................... 7
4.2
Preparations to be made on-site .................................................................................................................................. 7
4.3
Installing the drive unit .................................................................................................................................................... 7
4.4
Installing the floor guide points ................................................................................................................................... 9
4.5
Installing the moving leaf............................................................................................................................................. 10
Inserting roller carriage into the track ..................................................................................................................... 10
Fitting the moving leaves ............................................................................................................................................. 11
Adjusting the moving leaves ...................................................................................................................................... 12
Installing the driver ......................................................................................................................................................... 16
4.6
Installing the drive components ............................................................................................................................... 16
Fitting the toothed belt ................................................................................................................................................ 16
Fitting the toothed belt to the driver ...................................................................................................................... 16
Tensioning the toothed belt ....................................................................................................................................... 17
Setting the stop buffer .................................................................................................................................................. 17
Optional: positioning toothed belt locking mechanism ................................................................................. 18
Installing cable guides ................................................................................................................................................... 18
4.7
Cabling the drive components .................................................................................................................................. 19
Connecting motor gear unit and control unit ..................................................................................................... 19
Connecting transformer and control unit ............................................................................................................. 19
Installing transformer earthing .................................................................................................................................. 21
Connecting the toothed belt locking mechanism and control unit ........................................................... 22
Connect rechargeable battery and control unit ................................................................................................. 23
5
Production test and commissioning........................................................................................................................ 24
5.1
Connecting the drive ..................................................................................................................................................... 24
5.2
Installing the drive cover .............................................................................................................................................. 24
Testing drive cover earthing (on site)...................................................................................................................... 25
Connecting drive cover earthing .............................................................................................................................. 25
Sliding the drive cover in place .................................................................................................................................. 26
Installing the side panels .............................................................................................................................................. 26
5.3
Installing safety devices ................................................................................................................................................ 27
5.4
Installing operating elements/switches/push buttons .................................................................................... 27
5.5
Commissioning the door system .............................................................................................................................. 27
Creating log book ............................................................................................................................................................ 27
5.6
Dismantling ........................................................................................................................................................................ 28

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MCRdrive and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents