Installation
4
Installation
4.1 Tools and aids required
Tool
Tape measure
Marking pen
Torque spanner
Allen key
Open-ended spanner
Screwdriver set
Side-cutting pliers
Crimping pliers for cables
Wire stripper
Multimeter
Display programme switch/Service terminal
ST220/GEZEconnect
4.2 Preparations to be made on-site
Installation material is not included in the scope of delivery and must be chosen suitable
for the substrate and the static load.
Check the preparations made on-site by the customer to ensure proper installation:
Check the type and load capacity of the façade construction or suspending frame
Check that the installation surface is level
Check that the finished floor is level
Check the requirements of the wiring schematic
Check the on-site door frame against the GEZE specification drawing
4.3 Installing the drive unit
Protect the running surface against damage and soiling. Remove any soiling after installa-
tion.
Mark the fastening drill holes for the drive unit (see dimension specifications on the drawing).
GEZE MCRdrive
7
Need help?
Do you have a question about the MCRdrive and is the answer not in the manual?