Assembly, Installation and Commissioning
Insert batteries:
1. Push out the battery compartment cover on the back side in direction of the arrow.
2. Connect the block battery by the pressure buttons to the battery contact-clip and
insert it into the battery compartment.
3. Slide-in the battery compartment cover.
6.5

Initial Commissioning

Prior to commissioning check the original dimensions.
In order to obtain exact results with the electronic balances, the balance must have
reached its operating temperature (see warming up time at chapter "Technical data".
During this warm-up time the balance must be connected to the power supply (mains,
rechargeable battery or battery).
The accuracy of the balance depends on the local acceleration of gravity. Strictly
observe hints in chapter „Adjustment".