Table of Contents

Advertisement

Note
The control valve was checked by SAMSON
before delivery.
− Certain test results certified by SAMSON
lose their validity when the valve is
opened. Such testing includes seat leakage
and leak tests.
− The product warranty becomes void if
service or repair work not described in
these instructions is performed without
prior agreement by SAMSON's After-sales
Service.
− Only use original spare parts by
SAMSON, which comply with the original
specifications.
EB 8052 EN

9.1 Periodic testing

Depending on the operating conditions,
check the valve at certain intervals to prevent
possible failure before it can occur. Plant op-
erators are responsible for drawing up an
inspection and test plan.
Tip
Our after-sales service can support you in
drawing up an inspection and test plan for
your plant.
Servicing
9-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

3251-am

Table of Contents