Download Print this page

Huawei LUNA2000-2.0MWH Series Quick Manual page 24

Smart string ess
Hide thumbs Also See for LUNA2000-2.0MWH Series:

Advertisement

Installing Two-core DC Power Cables
Cut the corresponding pagoda connectors using a utility knife, route the DC power cables
through the cable holes at the bottom, and connect the cables to the DC circuit breakers.
No. Meaning
1
Screw assembly
2
Spring washer
(Optional) Large
3
washer
4
Wiring terminal
5
Copper bar
6
Flat washer
23

Advertisement

loading