Download Print this page

Huawei LUNA2000-2.0MWH Series Quick Manual page 18

Smart string ess
Hide thumbs Also See for LUNA2000-2.0MWH Series:

Advertisement

1. Select a 110 V or 220 V socket as required.
2. Connect the live wire and neutral wire.
Scenario 1: Installing a 110 V Socket
1. Connect the live wire and neutral
wire from the mains to positions 1
and 2 of the XT9 terminal block.
2. Install the 110 V switch.
3. Connect the live wire
(corresponding to cable 2056)
and neutral wire (corresponding
to cable 2055) from the upper
end of the switch to positions 1
and 2 of the XT9 terminal block.
Connect the live wire
(corresponding to cable 1751)
and neutral wire (corresponding
to cable 1752) from the lower
end of the switch to the socket.
No.
1
Scenario 2: Installing a 220 V Socket
Connect the live wire (corresponding to cables 1757) and neutral wire (corresponding
to cables 1760) from the lower end of the terminal block to the socket.
No.
Meaning
110 V/220 V socket
1
installation position
Meaning
110 V switch installation
position
17

Advertisement

loading