No.
Cable Hole
1
DC power cable hole
2
AC input power cable or ground cable hole
3
Optical cable or FE communications cable hole
4
UPS or RS485 cable hole (reserved)
(Optional) Connecting Socket Cables
5.2
This procedure applies only to the models listed in the table below.
Model
LUNA2000-2.0MWH-1HX
LUNA2000-2.0MWH-2HX
LUNA2000-2.0MWH-HE2HX
•
Cables 1733, 1735, 1734, and 1736 are pre-installed.
Cables 1751, 1752, 1757, 1760, 2055, 2056, 1761,
and 1762 need to be installed.
•
The cables to be installed can be obtained from the
cable binding position shown in the figure.
Air Conditioner Position in the Battery Cabin
1/3/5/7/9/11
1/4/7/10
No.
Meaning
Cable binding
1
position
16
•
Before installing
cables, remove the
cover from the control
unit cabin.
•
After cables are
installed, reinstall the
cover to the control
unit cabin and seal the
cable holes at the
bottom with sealing
mud.