Chapter 4 - Device Operations; Getting Ready For The Start-Up - Honeywell VC4 User Manual

4-point continuous monitor
Hide thumbs Also See for VC4:
Table of Contents

Advertisement

CHAPTER
4
Learn what you can do with your Honeywell VC4™ system Continuous Monitor.

4.1 Getting Ready for the Start-up

Learn the Honeywell VC4™ system start-up sequence and how to configure the analyzer
module for specific gas locations.
Honeywell loads all software on the DAq at the factory. Please configure each point for the
target gases at your facility.
Before you begin the start-up and configuration, gather the following information:
The location to which each point is connected
l
Target gas at each location
l
Alarm levels
l
Ahead of the start-up sequence, make sure that the following installation steps are completed:
Sample lines
l
Exhaust line
l
AC power connection
l
Sample Line Dust Filters
l
I/O Connection
l
VC4™
DEVICE OPERATIONS
32
User Manual

Advertisement

Table of Contents
loading

Table of Contents