CHAPTER
4
Device Operations
Learn what you can do with your Honeywell Vertex™ VC4 System Continuous Monitor.
Getting Ready for the Start-up
Learn the Honeywell Vertex™ VC4 system start-up sequence and how to configure the analyzer module for
specific gas locations.
Honeywell Analytics loads all software on the DAq at the factory. You need to configure each point for the
target gases at your facility.
Before you begin the start-up and configuration, gather the following information:
The location to which each point is connected
⚫
Target gas at each location
⚫
Alarm levels
⚫
Ahead of the start-up sequence, make sure that the following installation steps are completed:
Sample lines
⚫
Exhaust line
⚫
AC power connection
⚫
Sample Line Dust Filters
⚫
I/O Connection
⚫
Initial Startup
Use this section to turn on your Vertex™ VC4 System and to configure the analyzer module for specific gas
locations. There are eight parts to this startup procedure:
•
Power Up
•
Start Program
•
Log in the HMI program
•
Create a configuration profile
•
Replace the Chemcassette® Tape
•
Leak Checking Sample Lines
•
Adjust the Flow rate
•
Adjust Supply Vacuum
TM
Vertex
VC4 System
35
User Manual