5. Mechanical Installation
1. Choose a suitable place (wall, metal surface, desktop);
2. Use a marker to mark the drilling position;
3. Use an electric drill/impact drill to make holes at the marked locations;
4. Fastening with expansion screws (wall) or with nuts (metal surface)
Danger:
Please avoid other wires in the wall when drilling to avoid casualties.
Rail installation
1. Fix the guide rail in a suitable position
2. S3-Logger is tilted at a certain angle, so that the upper clip fits into the guide rail
3. Push the lower part of S3-Logger and snap it into the guide rail
Warning:
Please observe the surrounding environment during installation to avoid hand scratches.
Power supply installation
The power supply only supports rail installation. For installation steps, please refer to the
S3-Logger rail installation steps.
.9.
Need help?
Do you have a question about the S3-Logger and is the answer not in the manual?
Questions and answers