Deploying A New Plant - Huawei LUNA2000-7-S1 User Manual

Table of Contents

Advertisement

LUNA2000-(7, 14, 21)-S1
User Manual

6.4.1 Deploying a New Plant

Connection Test
Connection Test is supported in quick settings. You can perform this step to check
whether the cable connections are correct, avoiding site visits for rectification.
Tap Connection Test and wait until the test is complete. If the test fails, rectify
the fault in a timely manner.
Issue 01 (2024-03-27)
NO TE
For details, see
FusionSolar App Quick Guide
Copyright © Huawei Digital Power Technologies Co., Ltd.
6 Power-On and Commissioning
(EMMA).