Huawei LUNA2000-7-S1 User Manual page 57

Table of Contents

Advertisement

LUNA2000-(7, 14, 21)-S1
User Manual
● To prevent dust inhalation or contact with eyes, wear safety goggles and a dust
● Use a vacuum cleaner to clean up dust in and around the holes, and measure
● Before installing an Energy Storage Module, clean the ports on the base. Ensure
● Before tightening the screws on both sides of the equipment, ensure that the
Step 1 Fold the marking-off template as required and place it 15–20 mm away from the
wall. Mark the mounting holes on the floor. Then, attach the marking-off
template to the wall, mark the mounting holes on the wall, and use a hammer
drill to drill holes.
Step 2 Loosen the screws on both sides, separate the floor-mounting bracket from the
Energy Storage Control Unit, and remove the floor-mounting bracket.
Step 3 Rotate the leveling adjustment nut, use a level instrument to level the bracket,
and secure the bracket using expansion bolts.
Step 4 Install the first Energy Storage Module, move the Energy Storage Module onto the
floor-mounting bracket using lifting handles, tighten the screws on both sides, and
remove the protective cover from the battery cascading port on the top.
Step 5 Install the second Energy Storage Module and tighten the screws on both sides.
Step 6 Install the third Energy Storage Module, tighten the screws on both sides, and
install the L-shaped mounting brackets.
Step 7 Install the Energy Storage Control Unit and tighten the screws on both sides.
Issue 01 (2024-03-27)
NO TICE
mask when drilling holes.
the spacing. If the holes are inaccurately positioned, drill the holes again.
NO TE
Expansion bolts are delivered with the product. If the length or number of the bolts do not
meet installation requirements, prepare stainless steel expansion bolts by yourself. The
expansion bolts delivered with the product are used for solid brick-concrete walls and
concrete floors. If other types of walls and floors are used, ensure that the load-bearing
capacity requirements (the weight of one Energy Storage Module is 68 kg) are met and
appropriate bolts are selected.
NO TICE
that the ports are dry and free from dust and foreign objects. Otherwise, the
equipment may be damaged.
front panels of the modules are flush with each other.
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 Installing the ESS
51

Advertisement

Table of Contents
loading

This manual is also suitable for:

Luna2000-14-s1Luna2000-21-s1

Table of Contents