Commissioning; Power; Install The Yomper - Acekare YOMPER+ User Manual

Table of Contents

Advertisement

Tighten on the tube and cut the excess collar.
Snap in and turn the control box to lock.

3. Commissioning

Power on
Check that the EasyGo box is in the off position (screen off,
LEDs off)
Press the POWER button (4) on the Yomper. A flashing LED
tells you that the Yomper is waiting for its connection to the
control box.

Install the Yomper

Place the Yomper on the floor behind the wheelchair and roll
it forward as indicated by the arrow.
The front casters provide stability when setting up.
8

Advertisement

Table of Contents
loading

Related Products for Acekare YOMPER+

Table of Contents