UPS5000-A-(30 kVA-120 kVA)
User Manual
2.
Step 2 Install a stiffening beam at the front and rear of the rack respectively. After the
installation is complete, tighten the panel screws that secure the guide rails.
Issue 17 (2024-02-21)
Figure 4-44 Engaging the mounting ears (front view)
(1) Scale
Partially tighten the front and rear ends of the guide rail using panel screws.
NO TICE
Do not fully tighten panel screws. This facilitates subsequent adjusting when
installing reinforced beams.
Figure 4-45 Securing a guide rail (front view)
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 Installation and Cable Connection
(2) Mounting ear
(3) Lower edge of a U scale
97