Simpson 42115 Operating Instructions Manual page 46

Wireless doorbell with electrical socket
Table of Contents

Advertisement

1. Procedure to remove the Upper Pedestal and install the
Calibration Pedestal.
2. Raise the Furnace using the UP position on the Lift selector
switch. See Item #3 Fig. 2.
Figure No. 6.
3. Install the Calibration Cap (#8 Fig. 7) onto the Lower Pedestal (#4
Fig. 7).
4. Install the Mechanical Load Cell (#9 Fig. 8) part no. 0042125
between the Upper Pedestal and the Calibration Cap.
5. Refer to the "Certification of Calibration - Mechanical Load Cell
No. 42125" page 3, Calibration Summary chart, Deflection .01mm
column - line 2.
40
Remove the two bolts that secure the Crossbar (#1) to the
Furnace Guide Rods (#6), see Fig. 4.
Carefully remove the Crossbar with the Upper Pedestal
(#2 Fig. 5.) from the Furnace Guide Rods. Remove the
hardware holding the Upper Pedestal to the Crossbar and
separate the two pieces.
Install the Calibration Pedestal (#7 Fig. 5) into the
Crossbar and reattach the hardware previously removed
securing the Calibration Pedestal to the Crossbar.
Carefully reinstall the Crossbar with the Calibration
Pedestal into the two Furnace Guide Rods and secured it
with the two bolts previously removed. See Fig. 6.
Sand Rammer
Maintenance and Calibration 6
man-stc-42115-V15-27
Figure No. 7

Advertisement

Table of Contents
loading

This manual is also suitable for:

0042115-asm0042115-220-asm

Table of Contents