Simpson 42115 Operating Instructions Manual page 23

Wireless doorbell with electrical socket
Table of Contents

Advertisement

4 Unpacking and Installation
6. Open the plant air supplied lock-out valve and adjust the air
regulator to 4 bar (58 PSI).
7. Verify the voltage on the specification plate located on the back of
the High Temperature Compression Tester (see #5, fig. 1).
Connect the power cord located in the back panel of the tester
into a wall electrical receptacle. (see #6, figure 1).
Some areas may require an electrical plug that is not supplied with the
power cord to properly conform to the specific electrical outlet. These
electrical plugs will need an
purchased separately by the customer.
8. Connect the power cord from the furnace into the receptacle
located in the back panel of the Tester. (see #7, fig. 1)
9. Connect the thermocouple from the furnace into the receptacle
located in the back panel of the Tester. (see #8, fig. 1)
10. Connect the keyboard to the keyboard port on the right side of the
machine. Next to the USB
11. Fill the cooling pump tank with turbine oil ISO grade 22 (SAE 5
W) STC part number 0042156.
Once all connections are properly made the High Temperature
Compression Tester is ready to be used.
man-stc-42115-V15-27
electrical plug adapter and to be
port.
Figure No.1
Tester Back Panel
Sand Rammer
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

0042115-asm0042115-220-asm

Table of Contents