Download Print this page

Advertisement

Quick Links

J4Q000GR01
As this item contains many parts, please read the installation
instruction carefully before installation . Please use tools
properly and carefully. If you have any questions about the
product and installation, please contact us.
service@vabchesofficial.com
Our professional after-sales team will serve you online all
day.
1-24

Advertisement

loading

Summary of Contents for VABCHES J4Q000GR01

  • Page 1 J4Q000GR01 As this item contains many parts, please read the installation instruction carefully before installation . Please use tools properly and carefully. If you have any questions about the product and installation, please contact us. service@vabchesofficial.com Our professional after-sales team will serve you online all day.
  • Page 2: Before You Start

    Before You Start Read through each step carefully and follow the proper order Separate and count all your parts and hardware Give yourself enough room for the assembly process Have the following tools: Flat Head Screwdriver, #2 Phillips Head Screwdriver and Hammer Caution: If using a power drill or power screwdriver for screwing, please be aware of to slow down and stop when screw is tight.
  • Page 3: Board Identification

    Board Identification Not actual size MIDDLE PANEL LEFT PANEL RIGHT PANEL Qty:1 Qty:1 Qty:1 FIXED SHELF BOTTOM PARTITION Qty:1 Qty:1 Qty:2 BACK PANEL REAR TABLE LEG FRONT TABLE LEG Qty:2 Qty:2 Qty:2 3-34...
  • Page 4: Part List

    Board Identification Not actual size UPPER SUPPORT TUBE LOWER SUPPORT TUBE STORAGE BOX Qty:2 Qty:2 Qty:1 BOTTOM Qty:1 Part List Ø15X9.5mm Ø6.5X35mm Ø8X30mm M6X40mm CAM LOCK CAM BOLT WOODEN DOWEL BOLT spare:2 spare:2 spare:2 spare:2 4-34...
  • Page 5 Part List Ø4X40mm Ø3.5X14mm Ø3X12mm SCREW SCREW SCREW PLUG BOARD spare:1 spare:1 spare:1 ( Ø28 ) M6X20mm 4X65mm 17X9.5mm LEVELER HEX KEY LAMP TUBE LAMP BELT BUCKLE Ø4X30mm X1 set ANTI-TIPPING HARDWARE SCREW spare:1 Cam Lock Fastening System Insert the cam bolt into the hole first, then insert the cam lock and lock it. The opening must point toward the edge of the board 5-24...
  • Page 6 Board Identification Not actual size 6-24...
  • Page 7 STEP1 Ø8X30mm 7-24...
  • Page 8 STEP2 Ø15X9.5mm Ø6.5X35mm Proper orientation of CAM LOCK 8-24...
  • Page 9 STEP3 Ø4X40mm 9-24...
  • Page 10 STEP4 ( Ø28 ) M6X20mm 10-24...
  • Page 11 STEP5 4 X65mm M6X40mm The notch is facing up The notch is facing up 11-24...
  • Page 12 STEP6 4 X65mm M6X40mm Please tighten the screws to 80% first, and tighten all screws 100% after all parts are assembled. 12-24...
  • Page 13 STEP7 4 X65mm M6X40mm Please tighten the screws to 80% first, and tighten all screws 100% after all parts are assembled. 13-24...
  • Page 14 STEP8 Ø4X30mm 14-24...
  • Page 15 STEP9 Ø3.5X14mm Ø15X9.5mm Ø6.5X35mm Ø8X30mm X1 set Proper orientation of CAM LOCK 15-24...
  • Page 16 STEP10 Ø3X12mm 17X9.5mm X1 set 1.先将灯带背面的胶布撕掉. 2.然后将灯带压扣卡住灯带 3.最后对准相应的孔位,拧入螺丝(7),先拧入3/1,将灯带拉直并按压灯带,使 其粘牢在面板上面,最后拧紧所有的螺丝 16-24...
  • Page 17 STEP11 4 X65mm M6X40mm Please tighten the screws to 80% first, and tighten all screws 100% after all parts are assembled. 17-24...
  • Page 18 STEP12 Ø3.5X14mm 18-24...
  • Page 19 STEP13 Please read the following operating instructions for the use function of the light belt When the ground is uneven, you can rotate the feet to adjust the height. 19-24...
  • Page 20 STEP14 We have included a set of tipping restraint hardware for NOTE this unit. You must install this hardware to prevent :The tipping restraint hardware included is for accidents or injuries that can result from the unit falling. wooden stud wall construction. It must be attached to a When properly installed, this restraint can provide wall stud.
  • Page 21 21-24...
  • Page 22 22-24...
  • Page 23 23-24...
  • Page 24 24-24...