Receiving And Unpacking; Table 3.2 Inspecting The Ultraseal 20 Actuator Upon Delivery - Branson Emerson Ultraseal 20 Operating Manual

Table of Contents

Advertisement

3.2

Receiving and Unpacking

Branson Metal Welding actuator units are carefully checked and packed before dispatch. It
is recommended, however, that you follow the inspection procedure below after delivery.
To inspect the Ultraseal 20 Actuator when it is delivered

Table 3.2 Inspecting the Ultraseal 20 Actuator upon delivery

Step
1
2
3
4
5
NOTICE
CAUTION
DCM00051 REV. 10
Verify that all parts are complete according to the packing slip.
Check the equipment immediately after delivery to ensure that it has not
been damaged during transport.
Remove the actuator covers to check if any components became loose during
shipping.
Report any damage claims to your carrier immediately.
Determine if any component has become loose during shipping and, if
necessary, tighten screws.
If the goods delivered have been damaged during shipping, please
contact the forwarding agent immediately. Retain packing material
(for possible inspection or for sending back the unit).
The Controller is heavy. Handling, unpacking, and installation might
require assistance of a colleague or the use of a lifting device.
Action
29

Advertisement

Table of Contents
loading

Table of Contents