Operation; Unpacking The Machine - Cold Jet i3 MICROCLEAN Operator's Manual

Hide thumbs Also See for i3 MICROCLEAN:
Table of Contents

Advertisement

Nozzle
(MC25A45)
(MC25A90)
(MC26M)
(MC29MH)

Operation

Unpacking the Machine

This machine has been assembled and tested as one unit prior to shipment. Follow the steps below to
inspect and unpack the machine from the shipping container.
1. Examine the shipping container for any damage that may have occurred during transport.
2. Remove the machine. Recycle boxes and packaging.
3. Examine the machine for any external damage that may have occurred during transport.
Refer to the packing slip for a list of the components shipped with the machine.
damage has occurred to the shipping container or the machine or if any components are missing.
Click to go to Top of Document
Air Consumption
Blast Swath
Angled Nozzles
25 CFM
0.25 in
0.7 m
/min
(.6 cm)
3
25 CFM
0.25 in
0.7 m
/min
(.6 cm)
3
Advanced Nozzles
35 CFM
0.26 in
1.0 m
/min
(.7 cm)
3
50 CFM
0.29 in
1.5 m
/min
(.7 cm)
3
Dry Ice Feed Rate
Length
0.2-1 lbs/min
6 in
0.1-0.5 kg/min
(15.2 cm)
0.2-1 lbs/min
6 in
0.1-0.5 kg/min
(15.2 cm)
0.2-1.2 lbs/min
5 in
0.1-0.6 kg/min
(12.7 cm)
0.5-1.2 lbs/min
6 in
0.2-0.6 kg/min
(15.2 cm)
16
Material
Aluminum
Aluminum
Plastic &
Aluminum
Plastic &
Aluminum
Contact
Cold Jet if any
2023-12-13

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the i3 MICROCLEAN and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents