Cold Jet PE50 Pre-Installation

Dry ice manufacturing system – pelletizers

Advertisement

Quick Links

Pre-Installation
Guidelines & Checklist
Dry Ice Manufacturing System – Pelletizers
PE50 | PE80
The Cold Jet Project Lead and Customer Project Lead who will oversee the successful
installation of the pelletizer and maximize the performance of the new dry ice manufacturing
system:
Cold Jet Project Lead
Customer Project Lead
Telephone
Telephone
Email
Email

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PE50 and is the answer not in the manual?

Questions and answers

Summary of Contents for Cold Jet PE50

  • Page 1 Guidelines & Checklist Dry Ice Manufacturing System – Pelletizers PE50 | PE80 The Cold Jet Project Lead and Customer Project Lead who will oversee the successful installation of the pelletizer and maximize the performance of the new dry ice manufacturing system:...
  • Page 2 INFORMATION AND INTELLECTUAL PROPERTY CONTAINED HEREIN IS CONFIDENTIAL BETWEEN COLD JET AND THE CLIENT AND REMAINS THE EXCLUSIVE PROPERTY OF COLD JET. IF YOU FIND ANY PROBLEMS IN THE DOCUMENTATION, PLEASE REPORT THEM TO US IN WRITING. COLD JET DOES NOT WARRANT THAT THIS DOCUMENT IS ERROR-FREE.
  • Page 3: Table Of Contents

    ABLE OF ONTENTS Introduction INSTRUCTION – UNPACKING AND PREPARATIONS BEFORE INSTALLATION Unpacking and Examination for Transport Damages Requirements on the Environment Surrounding the PE50/80 Pre-Installation by the Customer Production Space Requirements Liquid CO Supply System Liquid CO Degasser System Gas CO...
  • Page 4 PE50 & PE80 Version: Page: 3 of 15 Preinstallation manual Date: 22.02.2023...
  • Page 5: Introduction

    Components may have been removed for illustrative purposes or the continuing improvement of the pelletizer’s design may cause changes that are not included in this publication. PE50 & PE80 Version: Page:...
  • Page 6: Instruction - Unpacking And Preparations Before Installation

    INSTRUCTION – UNPACKING AND PREPARATIONS BEFORE INSTALLATION This machine has been assembled and tested at Cold Jet's test center before being crated and shipped as one unit. Follow the steps below to unpack and inspect the machine from the shipping container.
  • Page 7: Pre-Installation By The Customer

    35 ppmv and not be less than 5 ppmv - or equivalent to a dew point temperature of -66°C to -51°C (-86.8°F to -59.8°F). If only very dry CO is present please contact Cold Jet for optimal special extrusion process design and settings. Please note that the CO...
  • Page 8: Liquid Co 2 Degasser System

    Degasser System In order to achieve a consistent, high-quality supply of liquid CO to the pelletizer, Cold Jet recommends the installation of an automatic gas venting system, such as the Armstrong Kit. Installing an automatic gas venting system will improve the performance of the pelletizer and increase dry ice production.
  • Page 9: Co 2 Battery

    When operating our PE50 pelletizer from a battery, it is important to select the correct type of battery. We need to use the upside-down version to keep an optimal production, as Dry ice is made from liquid. These battery’s come with a special outlet fitting and therefore it is crucial to get a reduction from the gas supplier. This reduction must end with a 3/8”...
  • Page 10: Repair And Warranty

    • Piston on the extruder When making repairs/replacements, use only original Cold Jet spare parts. MAINTENANCE Cleaning the PE50/80 The following steps are necessary when the PE50/80 needs to be cleaned. Disconnect the power. ● Protect all electronic equipment. ●...
  • Page 11: Terms Of Warranty

    Cold Jet technician or by the owner’s qualified personnel who has been trained by Cold Jet in the repair and maintenance of Cold Jet dry ice blasting and dry ice production machines and accessories.
  • Page 12: Safety

    Follow local governing codes to ensure a minimum standard of safety. • Wear protective gloves, safety glasses, and ear plugs. • Operate the pelletizer in a well-ventilated work area with a CO monitoring/alarm system. • PE50 & PE80 Version: Page: 11 of 15 Preinstallation manual Date: 22.02.2023...
  • Page 13: Pre-Installation Checklist

    BENDS OR DEFLEXIONS MUST NOT BE RIGHT ANGLED!!! The recommended radius of the bending would be equal to 5 x the internal diameter of the pipe. If the pelletizer were to be installed inside a building and next to a wall, Cold Jet recommends to place ...
  • Page 14: Pre-Installation Conformation Form

    Order: ___________________________________________________________________________________________ Owner/Contact: ____________________________________________________________________________________ Signature: _________________________________________________________________________________________ Date: _____________________________________________________________________________________________ Notes/Remarks to Cold Jet: ___________________________________________________________________________ Email the signed form to the to the Cold Jet project lead named on the front page PE50 & PE80 Version: Page: 13 of 15 Preinstallation manual Date: 22.02.2023...
  • Page 15: Notes

    NOTES PE50 & PE80 Version: Page: 14 of 15 Preinstallation manual Date: 22.02.2023...
  • Page 16: Contact Information

    Phone (US): +1-800-777-9101 455 Wards Corner Road Phone (Outside US): +1(513)576-8981 Loveland, Ohio 45140 Email: service@coldjet.com Canada - Cold jet Canada Phone: +1-800-337-9423 Ext. 501 1727 Industrial Road, Unit 1 After Hours Support: +1-(513) 576-8981 Cambridge, Ontario N3H 5G7 Email: service@coldjet.com...