Grounding Requirements; Wiring; Power; Figure 3: Ground Bus Terminal - Smartrise Sprecher + Schuh Startup Manual

Table of Contents

Advertisement

Soft Starter Startup Manual Sprecher + Schuh Hydraulic Installation

Grounding Requirements

NOTE: A proper and effective building ground connection is required for the safe and successful
operation of the controller.
Examples of a proper building-to-controller ground are as follows:
1. Attach the ground wire to the street side of a water main.
2. Attach the ground wire to a grounding rod in the pit.
The controller has a common ground bus terminal connection.
• The building, motor, transformer, and filter(s) must all share a common ground. This
removes ground loops, limits impedance, and routes noise into the ground.

Wiring

A checklist must be completed during the soft starter wiring process. See Appendix 3 for
terminal location.

Power

Perform the following to connect power. See V2 Controller sheet 03 Machine Room for job
specific information.
• Connect main line power L1/L2/L3 to soft starter.
• Connect the ground wire to the green terminal screw on the soft starter mounting plate or
ground bus terminal.
Page 2

Figure 3: Ground Bus Terminal

© 2020 Smartrise Engineering, Inc. All Rights Reserved
October 26, 2020

Advertisement

Table of Contents
loading

Table of Contents