Grounding Requirements; Wiring; Power; Figure 3: Ground Bus Terminal - Smartrise HYDRO:EVOLVED Startup Manual

Soft starter
Hide thumbs Also See for HYDRO:EVOLVED:
Table of Contents

Advertisement

Soft Starter Startup Manual Siemens

Grounding Requirements

NOTE: A proper and effective building ground connection is required for the safe and successful
operation of the controller.
Examples of a proper building-to-controller ground are as follows:
1. Attach the ground wire to the street side of a water main.
2. Attach the ground wire to a grounding rod in the pit.
The controller has a common ground bus terminal connection.
• The building, motor, transformer, and filter(s) must all share a common ground. This
removes ground loops, limits impedance, and routes noise into the ground.

Wiring

A checklist must be completed during the soft starter wiring process. See Appendix 2 for
terminal location.

Power

Perform the following to connect power. See the Hydro:Evolved sheet 7 for job specific
information.
• Connect main line power L1/L2/L3 to soft starter.
• Connect the ground wire to the green terminal screw on the soft starter mounting plate.
Page 2

Figure 3: Ground Bus Terminal

© 2021 Smartrise Engineering, Inc. All Rights Reserved
January 30,2021

Advertisement

Table of Contents
loading

Table of Contents