Download Print this page
Hachette ALIEN spectacular Assembly

Hachette ALIEN spectacular Assembly

1:2 scale
Hide thumbs Also See for ALIEN spectacular:

Advertisement

Quick Links

A L I E N
spectacular
1:2
scale
EASY
EASY
ASSEMBLY
ASSEMBLY
PACK 10
KITS 69 - 76
BUILD THE
TERRIFYING
XENOMORPH
FROM ALIEN

Advertisement

loading
Need help?

Need help?

Do you have a question about the ALIEN spectacular and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Hachette ALIEN spectacular

  • Page 1 A L I E N spectacular scale EASY EASY ASSEMBLY ASSEMBLY BUILD THE TERRIFYING XENOMORPH FROM ALIEN PACK 10 KITS 69 - 76...
  • Page 2 Keep away from children. If you suspect a magnet has been swallowed, seek medical help straight away. Hachette Partworks Ltd, 4th Floor, Jordan House, Some parts may have sharp edges, please handle them with care.
  • Page 3 A S S E M B L Y G U I D E K I T 6 9 : T H E L E F T L E G ( V I I I ) In this kit you will continue to work on parts of the Xenomorph’s left leg. 69-1 69-2 69-3...
  • Page 4 K I T 6 9 : T H E L E F T L E G ( V I I I ) 69-10 69-10 69-2 69-8 69-8 69-2 69-1 69-1 Align Femur 69-1 next to Femur 69-2, as shown. Join the two sections of the Femur 69-1 69-2...
  • Page 5 K I T 6 9 : T H E L E F T L E G ( V I I I ) 69-1 68-1 Line up the two femur assemblies 69-1/69- 68-1/68-2 ready to join them together in the next step.
  • Page 6 K I T 6 9 : T H E L E F T L E G ( V I I I ) 69-1 68-1 After the Magnets 69-9 have set firmly in place, 69-2 fit the femur assembly 68-1/68-2/69-1/69-2 inside the Skin 68-3. 68-2 68-3 69-9...
  • Page 7 K I T 6 9 : T H E L E F T L E G ( V I I I ) 66-2 67-1 66-3 67-2 Take the skin 66-1 and femur assembly 66-2/66-3/67-1/67-2 which was worked on in pack 9 - kit 67 and remove the skin 66-1.
  • Page 8 K I T 6 9 : T H E L E F T L E G ( V I I I ) 69-3 (B3) 69-4 (B4) 69-5 (B5) Finally, the Skin Appendages B3 69-3, B4 69-4 and B5 69-5 are test-fitted onto the Thigh Skin 66-1, as shown.
  • Page 9 K I T 7 0 : T H E L E F T L E G ( I X ) In this kit you will start to build parts of the left pelvis. 70-1 70-2 70-3 70-4 70-5 70-6 70-7 70-8 70-9 70-10...
  • Page 10 K I T 7 0 : T H E L E F T L E G ( I X ) 70-5 Fit the two pegs on one of the Socket Liners 70-5 into the holes in the Pelvis Joint 70-2. 70-2 70-5 Repeat the previous step to fit...
  • Page 11 K I T 7 0 : T H E L E F T L E G ( I X ) 70-1 70-3 70-2 Take the Ball Joint 70-3 and fit the larger end into the Joint assembly 70-2/70-5. Study the diagram carefully to ensure it is fitted the correct way round.
  • Page 12 K I T 7 0 : T H E L E F T L E G ( I X ) 70-8 70-2 Insert three 3x22mm screws 70-8 through the holes in Joint 70-2. These are secured in place from underneath the assembly with three nuts 70-9 which fit into hexagonal...
  • Page 13 K I T 7 0 : T H E L E F T L E G ( I X ) 69-1 68-1 69-2 Take the assembly 1/68-2/69-1/69-2 from the previous kit and remove 68-2 the skin 68-3. 68-3 70-1 70-2 The joint assembly is now fitted to the femur.
  • Page 14 K I T 7 0 : T H E L E F T L E G ( I X ) 70-10 70-4 70-1 69-2 70-2 Secure the joint assembly in place by fitting the Grip 70-4 over the peg. The Grip 70-4 is held in place...
  • Page 15 A S S E M B L Y G U I D E K I T 7 1 : T H E L E F T L E G ( X ) In this kit you will be working on the left tibia and femur as well as building parts of the knee.
  • Page 16 K I T 7 1 : T H E L E F T L E G ( X ) Take the left tibia and femur assemblies built in previous kits. Study the diagram carefully to see how the calf assembly 63-1 fitted between the femur assemblies...
  • Page 17 K I T 7 1 : T H E L E F T L E G ( X ) 71-11 Use four Flange screws 71-11 secure the Knee Skin 71-3 in place. Take care not to over-tighten these screws. 71-3 71-11 63-4 Take the left calf...
  • Page 18 K I T 7 1 : T H E L E F T L E G ( X ) 71-12 Join the two parts of the Tibia Protector 71-1 71-2 together, as shown, 71-2 and fix in place with two 2.3x4mm screws 71-12.
  • Page 19 K I T 7 1 : T H E L E F T L E G ( X ) 71-1 (C1) 71-2 (C2) 63-1 61-2 63-4 Turn the tibia 65-1 assembly over and study the diagram (left) to see how the skin 2/63-4 Tibia Protector...
  • Page 20 K I T 7 1 : T H E L E F T L E G ( X ) 71-4 (A6) 71-4 68-3 66-1 66-1 Next, the skin covering 68-3 which was worked on in the last kit is joined to skin 66-1. There Take the skin 66-1 which was...
  • Page 21 T H E L E F T L E G ( X ) 66-1 68-3 In a similar way to fitting the tibia skin in step 5, wrap the skin assembly 1/68-3 around the left femur 67-2 66-3/67-2/68-1/69-1. After making sure it is correctly positioned, glue the seam together at either end 66-3 as shown in the inset diagram.
  • Page 22 A S S E M B L Y G U I D E K I T 7 2 : T H E L E F T L E G ( X I ) In this kit you will build the Xenomorph’s left foot. 72-1 72-2 72-3...
  • Page 23 K I T 7 2 : T H E L E F T L E G ( X I ) 72-10 Join the Thigh Protector 72-1 parts 72-1 72-2 together. After test-fitting, fix the two parts together with a 2.3x4mm screw 72-10. 72-2 Take the left leg assembly which was worked on in...
  • Page 24 K I T 7 2 : T H E L E F T L E G ( X I ) Working now at the other end of the leg, take the Ankle Collar 72-5 and pass it over the ball on part 65-4, as shown. It may help, when fitting the foot in the next step, if the collar is pushed slightly further up the leg than its final position.
  • Page 25 K I T 7 2 : T H E L E F T L E G ( X I ) 72-4 65-4 72-3 Fit the two halves of the Left Foot assemblies 72-3 72-4 around the ball joint 65-4, as shown. 72-7 Keeping the two halves of the Left Foot...
  • Page 26 K I T 7 2 : T H E L E F T L E G ( X I ) 72-9 Finish securing the foot assembly together by fitting two 2.3x6mm screws 72-9. 72-9 72-4 KIT 72 IS COMPLETE Further work has been done on the left leg with the thigh protector and foot being fitted.
  • Page 27 A S S E M B L Y G U I D E K I T 7 3 : T H E L E F T L E G ( X I I ) In this kit you will continue to work on parts of the left foot and thigh. 73-1 73-2 73-3...
  • Page 28 K I T 7 3 : T H E L E F T L E G ( X I I ) 73-1 73-2 66-3 67-2 Take the leg assembly which was worked on in the previous kit. Test-fit the Thigh Protector 73-2, into the opening in the skin above parts 67-2...
  • Page 29 K I T 7 3 : T H E L E F T L E G ( X I I ) 73-4 (D2) Test-fit Pipe D2 73-4 into the thigh protector assembly 72-1/72-2 as a continuation of the previously fitted Pipe 73-3. When satisfied with the fit, glue in place.
  • Page 30 K I T 7 3 : T H E L E F T L E G ( X I I ) After test-fitting Pipe 73-5 73-7 into the slots in Foot Skin 73-5, glue in place. 73-7 (E2) KIT 73 IS COMPLETE Pipes and protectors have been fitted to the left leg and the foot skin.
  • Page 31 A S S E M B L Y G U I D E KIT 74: THE LEFT LEG AND THE ABDOMEN In this kit you will continue to build the Xenomorph’s left leg and start work on the abdomen. 74-1 74-2 74-3 74-5...
  • Page 32 K I T 7 4 : T H E L E F T L E G A N D T H E A B D O M E N ( X I I ) 73-5 73-5 74-3 (E4) 74-2 (E3) Take the foot skin 73-5 from...
  • Page 33 K I T 7 4 : T H E L E F T L E G A N D T H E A B D O M E N ( X I I ) Test-fit the other half of the foot skin 73-5 over the foot 72-3...
  • Page 34 K I T 7 4 : T H E L E F T L E G A N D T H E A B D O M E N ( X I I ) 74-8 74-8 Turn over the Abdomen Skin 74-4 and glue five...
  • Page 35 A S S E M B L Y G U I D E KIT 75: THE ABDOMEN (I) In this kit you will continue to work on parts of the abdomen. 75-1 75-2 75-3 75-4 75-5 75-6 75-7 75-8 75-9 PARTS SUPPLIED Name Name...
  • Page 36 K I T 7 5 : T H E A B D O M E N ( I ) 75-3 (F5) 75-2 (F4) 74-4 74-4 Pipe F5 75-3 is fitted just Take the abdomen skin 74-4 below Pipe 75-2. After- from the previous kit and test-fitting, glue in place.
  • Page 37 K I T 7 5 : T H E A B D O M E N ( I ) 75-7 (F9) 75-6 (F8) Next, take the Right Flank Skin 75-1, supplied with this kit and test-fit Pipes F8 75-6 F9 75-7, as shown. These pipes will only fit in the correct orientation.
  • Page 38 K I T 7 5 : T H E A B D O M E N ( I ) 75-9 75-9 75-9 Turn the Right Flank Skin 75-1 over and glue six Magnets 75-9 into the circular recesses, as shown. It doesn’t matter which way round they are fitted.
  • Page 39 A S S E M B L Y G U I D E KIT 76: THE ABDOMEN (II) In this kit you will continue to work on different parts of the Xenomorph’s abdomen. 76-1 76-2 76-3 76-4 76-5 76-6 76-7 76-8 76-9 PARTS SUPPLIED...
  • Page 40 K I T 7 6 : T H E A B D O M E N ( I I ) 76-3 (G2) 76-2 (G1) 76-4 (G3) 76-1 76-1 Take the Left Flank Skin 76-1 After test-fitting Pipe G3 76-4 into the and place it on the work surface.
  • Page 41 K I T 7 6 : T H E A B D O M E N ( I I ) 76-8 76-8 76-8 76-1 Turn the Left Flank Skin 76-1 over and glue six Magnets 76-8 into the circular recesses, as shown in the above diagram.
  • Page 42 K I T 7 6 : T H E A B D O M E N ( I I ) 76-9 76-7 Fit the remaining Connector 76-7 over the other raised screw socket, shown to the right in the diagram. Fix in place with a 2.3x6mm screw 76-9.