Testing The Installation; Figure 5.15 Normal Front Panel Display After Power-Up - Emerson Branson 2000X Original Instructions Manual

Micro actuator
Table of Contents

Advertisement

5.8

Testing the Installation

1. Turn on the air supply connections with the air pressure regulator set at minimum values, and
verify that the system has air pressure
2. Ensure there are no leaks in the air supply connections
3. Turn on the power supply. The power supply will begin its normal self-check
4. If the power supply displays an alarm message, find the alarm message definition, cause and
correction in
5. Press the Test button
6. If the Power Supply displays an alarm message at this point, find the alarm message definition in
the Maintenance section of
no alarm messages displayed, go on to the next step
7. Fit a test part onto the fixture
8. Press the Horn Down key and then press and hold the two start switches. The horn will descend
to the fixture on the base of the actuator. This verifies specifically that the pneumatic system is
working
9. Press the Horn Down key again. The horn will retract. The system should now be functional and
can be set up for your application
In summary, if the Power Supply does not display an alarm message and the Actuator
descends and retracts correctly, your ultrasonic welder is ready for operation.

Figure 5.15 Normal Front Panel Display After Power-Up

NOTICE
100-412-182 REV. 06
Chapter 7: Maintenance
Chapter 7: Maintenance
02:Tm=.200s
Cycle#
Time
[s]
44
0.200
43
0.200
42
0.200
41
0.200
40
0.200
39
0.200
38
0.200
Weld Results
Main Menu
It is recommended that the customer performs a risk assessment of
the welding system installation to ensure safe operation.
of the power supply manual
of the Power Supply manual. If there are
Print
Weld Results
RUN:TIME =
1.000
Pk Pwr
Energy
Freq Chg
(%)
[J]
[Hz]
68.9
145.5
-3
69.2
145.7
-2
68.8
145.2
-2
68.5
143.2
-2
68.4
143.1
-3
68.4
143.8
-3
68.5
143.5
+0
Column Setup
Weld Setup
Graphs
65

Advertisement

Table of Contents
loading

Table of Contents