Final Assembly - Vetus BOW12512D Installation And User Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 16
4.3

Final assembly

• Check again dimension 'H' .
• Make sure that the key (1) is properly positioned in the keyway of
the shaft.
• Grease the shaft with 'outboard gear grease'*) and install the pro-
peller (2) with the lock washer (3) and the hexagonal nut (4).
• Secure the nut by bending the tag of the washer.
• Fit the zinc anode (5) to the propeller shaft by means of the bolt
(6)
The propeller should run a minimum of 1.5 mm (
thrust tube wall, all round.
• Grease the input shaft with an installation compound, like
'Molykote® G-n plus'
• Fit the flexible coupling to the input shaft of the tail piece and
secure the coupling with the locking screw.
• Grease the shaft of the electric motor with an installation com-
pound, like 'Molykote® G-n plus' .
• Grease the threads of the fastenings bolts with 'outboard gear
grease'*) and install the electric motor to the intermediate flange.
Use one of these bolts to fasten the relay support as well.
• For a first check, turn the propeller by hand, it should turn easily,
whilst being connected to the output spindle of the electric mo-
tor.
*) A suitable grease is VETUS 'Shipping Grease' , Art. code: VSG.
Installation and user manual bow thruster BOW12512D and BOW12524D
M16
20 - 25 Nm
(15 - 18 ft.lbf )
5
1
/
") free of the
16
Molykote® G-n plus
H = 32 - 35 mm
(1
1
/
"- 1
3
/
")
4
8
24
1
2
3
4
6
M6
5
M6
4 - 5 Nm
(3 - 3.7 ft.lbf )
Molykote® G-n plus
Outboard Gear
Grease
ENGLISH
Outboard Gear
Grease
5 - 6 Nm
(3.7 - 4.4 ft.lbf )
3
M8
6
12 - 15 Nm
(9 - 11 ft.lbf )
21
020557.04

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bow12524d

Table of Contents