Top Cover - Vinten Vision 30 Maintenance Manual

Pan and tilt head
Table of Contents

Advertisement

Contents
10.3 The adaptor assembly is refitted by a reversal of this procedure.
Dismantle
11
To dismantle the platform assembly
11.1 Unscrew and remove two M3 pan head screws (129) and slide out gib strip (218).
11.2 Tap out spirol pin (212) from one slide adjuster knob (211) and remove knob with its shim (159).
11.3 By turning remaining knob withdraw the slide adjuster stud (209) from threaded block (207).
11.4 Further dismantling of the platform will be obvious on inspection.
Assemble
12
Reassembly of the platform assembly is performed by a reversal of the procedure detailed at
noting the following points.
12.1 Dovetail faces should be lightly lubricated with Shell Tonner TX-32 grease.
12.2 The remaining moving contact surfaces should be lightly lubricated with white bearing grease.
12.3 The 'T' on threaded block (207) must be on visible face.
12.4 The gib strip (218) is lightly retained by the M3 screws.
12.5 Screws securing threaded block (207), platform slide block (210) and gib strip (218) are locked
using Loctite 221 on the threads.
12.6 Dovetail insert (215) should be adjusted to ensure an easy sliding action with minimum
clearance.
Refit
13
The platform assembly is refitted by a reversal of the procedure detailed at

Top cover

Remove
14
The top cover (37) is removed as follows
14.1 Remove platform as detailed in
14.2 Unscrew and remove four M4 socket cap head screws (33).
14.3 Remove top cover (37)
(Fig
6.8),proceed as follows
(Fig
6.2):
Para
9.
First
Previous
Next
Page
Page
Page
Para
9.
Previous
View
Para 11
27

Advertisement

Table of Contents
loading

Table of Contents