The top cover is refitted by a reversal of the procedure detailed at
flush with the main casting (61)

Front cover

Remove
16
The front cover (32) is removed as follows
16.1 Remove top cover as detailed in
16.2 Unscrew and remove four M4 socket cap head screws (33).
16.3 Remove front cover (32).
Refit
17
The front cover is refitted by a reversal of the procedure detailed at
is flush with the main casting (61)
End plate/adjustment thread assembly
WARNING!: There is risk of serious injury if any attempt is made to remove the end
plate/adjustment thread assembly while the main spring is compressed, i.e. when the
platform is tilted or when adjustment knob is not turned fully counter-clockwise.
Remove
18
The end plate/adjustment thread assembly (29) is removed as follows
18.1 Position tilt assembly horizontally and engage CENTRE LOCK.
18.2 Rotate BALANCE adjustment knob (186) fully counter-clockwise.
18.3 Unscrew and remove single M6 button head screw (31) below adjustment knob (186).
18.4 Unscrew and remove six M6 button head screws (30), three from each side of adjustment knob
(186).
18.5 Withdraw end plate/adjustment thread assembly (29) from main casting (61)
18.6 Withdraw main spring (28) from within mechanism block assembly (12).
NOTE: Complete dismantling of the assembly is not recommended. Should the needle thrust
bearing (193) require regreasing this can be accomplished with the bearing in situ after
screwing the main spring adjustment shaft (191) out of the adjustment nut (201). If it
becomes necessary to remove bearing (193) a procedure for its removal is detailed at
61.
(Fig
6.3).
(Fig
6.2):
Para
14.
(Fig
6.3).
First
Previous
Page
Page
Para
14, ensuring the left-hand end is
Para
16, ensuring the left-hand end
(Fig 6.7
and
Fig
6.2):
(Fig
6.3).
Next
Previous
Page
View
Para
28

Advertisement

Table of Contents
loading

Table of Contents