6.4.2 Commissioning Functions

Commission the following functions as needed:
Table 6-4 Commissioning functions
Function
Adding
Intelligent
Electrical
Equipment
Limited Feed-
in
Scheduling via
DI Port
Issue 03 (2023-12-27)
Scenario Description
Intelligent electrical equipment (such
as SG Ready heat pumps and
electrical devices controlled by smart
switches) in your home can be added
to the FusionSolar app for
management.
If surplus PV power is fed into the
grid, the parameter of limited feed-in
power can be set to ensure that the
feed-in power is within the range
specified by the grid company.
Applies to scenarios where the grid
company performs remote scheduling
through dedicated ripple control
receivers. The grid company remotely
delivers a scheduling command (%)
to the plant with a wireless
transmitting apparatus. Then, the
wireless receiving apparatus receives
the scheduling command and
converts it into a DI signal. The
EMMA controls the inverter to output
the corresponding power.
Copyright © Huawei Digital Power Technologies Co., Ltd.
6 System Commissioning
Procedure
For details, see
FusionSolar App
Quick Guide
(EMMA), or scan the
QR code to download
the quick guide.
63

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smartguard-63a-aus0

Table of Contents