6.4.1 Deploying a New Plant

Deploying a New Plant
Connection Test
Connection Test is supported in quick settings. You can perform this step to check
whether the cable connections are correct, avoiding site visits for rectification.
Tap Connection Test and wait until the test is complete. If the test fails, rectify
the fault in a timely manner.
Issue 03 (2023-12-27)
NO TE
● For details about new plant deployment and existing plant reconstruction, see
FusionSolar App Quick Guide
● In the existing plant reconstruction scenario, the SmartGuard and Dongle cannot be
used at the same time. You need to remove the Dongle from the inverter. The
SmartGuard has a built-in meter. The original meter in the plant is removed.
● For details about how to set ESS parameters, inverter parameters, and optimizer layout,
see
Residential Smart PV Solution Quick Guide (Single-Phase PV+ESS Scenario +
SmartGuard
Networking).
Copyright © Huawei Digital Power Technologies Co., Ltd.
(EMMA), or scan the QR code.
6 System Commissioning
62

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smartguard-63a-aus0

Table of Contents