SmartGuard-63A-(S0, AUS0)
User Manual
Procedure
Step 1 Determine the positions for drilling holes using the marking-off plate, and then
mark the positions with a marker.
Figure 4-7 Determining hole positions
Step 2 Drill holes using a hammer drill.
Figure 4-8 Drilling holes
Step 3 Secure the mounting bracket.
Pre-tighten the nuts, spring washers, and flat washers of the lower two bolt
assemblies.
Issue 03 (2023-12-27)
NO TE
You are advised to apply anti-rust paint on the hole positions for protection.
NO TICE
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 System Installation
33