6.2 Closing the Maintenance Compartment
Step 1 Install the cover of the maintenance compartment, and tighten the screw on the
cover.
Figure 6-1 Closing the cover
Step 2 Before closing the maintenance compartment door, turn on the three switches
shown in the following figure (using the connection to the LC0 inverter as an
example). During deployment and normal operation, do not operate the bypass
switch shown in the figure.
● Bypass switch: When the grid is available but the SmartGuard is abnormal and
● Currently, only one inverter can be connected. Turn on the switches based on
Issue 03 (2023-12-27)
NO TE
● Before closing the maintenance compartment, remove tools, unused screws, and residue
of cable stripping from the maintenance compartment.
● Keep the delivered keys properly for future use.
D ANGER
cannot supply power to loads, refer to
of the
SmartGuard. Misoperations may cause electric shocks.
the model of the connected inverter.
Copyright © Huawei Digital Power Technologies Co., Ltd.
6 System Commissioning
7.4 Operations on the Bypass Switch