● The two-core cable and three-core cable are connected in the same way. The
● The PE point at the AC output port is used only as a PE equipotential bonding
● Ensure that the cable jacket is inside the connector.
● Insert the exposed core wires completely into the holes.
● Connect the AC output power cable securely. Otherwise, the device may fail to
● Ensure that the cables are not twisted.
----End

5.6 Installing the Backup Load Output Power Cable

Precautions
Procedure
Step 1 Crimp AC cord end terminals.
Issue 03 (2023-12-27)
NO TICE
two-core cable is not connected to the PE.
indicates that the three waterproof plugs delivered with the product are not
used.
point, and cannot substitute for the PE point on the enclosure.
operate properly or the AC connector may be damaged.
NO TE
The cable colors shown in the figures are for reference only. Select an appropriate cable
according to the local standards.
An RCD must be installed before the backup load. During off-grid operation,
the main circuit breaker does not provide protection. Electric leakage on the
loads may result in electric shocks.
If the power of backup loads exceeds the maximum off-grid power of the
inverter, the inverter may be shut down due to overload. In this case, you
need to shut down some loads.
NO TE
The AC cord end terminals delivered with the product are mainly used for cables with a
cross-sectional area of 16 mm
are used, select AC cord end terminals that meet the requirements.
Copyright © Huawei Digital Power Technologies Co., Ltd.
2
. If cables with a cross-sectional area of less than 16 mm
5 Electrical Connections