Installing The Non-Backup Load Output Power Cable - Huawei SmartGuard-63A-S0 User Manual

Table of Contents

Advertisement

SmartGuard-63A-(S0, AUS0)
User Manual
● The two-core cable and three-core cable are connected in the same way. The
● The PE point at the AC output port is used only as a PE equipotential bonding
● Ensure that the cable jacket is inside the connector.
● Insert the exposed core wires completely into the holes.
● Connect the AC output power cable securely. Otherwise, the device may fail to
● Ensure that the cables are not twisted.
----End
5.7 Installing the Non-backup Load Output Power
Cable
Procedure
Step 1 Crimp AC cord end terminals. You can crimp AC cord end terminals for two-core or
three-core cables.
Figure 5-13 Crimping AC cord end terminals
Step 2 Connect the non-backup load output power cable.
Issue 03 (2023-12-27)
NO TICE
two-core cable is not connected to the PE.
indicates that the three waterproof plugs delivered with the product are not
used.
point, and cannot substitute for the PE point on the enclosure.
operate properly or the AC connector may be damaged.
NO TE
The cable colors shown in the figures are for reference only. Select an appropriate cable
according to the local standards.
NO TE
The AC cord end terminals delivered with the product are mainly used for cables with a
cross-sectional area of 16 mm
are used, select AC cord end terminals that meet the requirements.
Copyright © Huawei Digital Power Technologies Co., Ltd.
2
. If cables with a cross-sectional area of less than 16 mm
5 Electrical Connections
2
47

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smartguard-63a-aus0

Table of Contents