GE AKTA ready XL Operating Instructions Manual page 100

Table of Contents

Advertisement

5 Preparation
5.2 Install disposable flow kits
100
TeDIS Valid on Date Printed
Step
Action
1
Open the door in front of the pump wagon (A). Then release the pump wag-
on from the system, pull out and turn the two locking pins clockwise (B) on
either side of the pump wagon frame.
2
Pull out the pump wagon from under the system without pulling the cables
(C).
3
Lock the front wheels of the pump wagon.
4
Locate the pump chamber (head) in the isocratic flow kit.
C
A
B
B
ÄKTA ready XL Operating Instructions 29281616 AE
Printed on: 15-09-2023 11:27:35 ***
B

Advertisement

Table of Contents
loading

Table of Contents