GE AKTA ready XL Operating Instructions Manual page 56

Table of Contents

Advertisement

3 System description
3.4 System components
3.4.4 Valves
56
TeDIS Valid on Date Printed
Step
Action
1
Put the pin in to the unlocked position to enable the valve to be opened or
closed.
Note:
The valves are fitted to minimize the length of the tubing. Therefore the di-
rection of the pin to lock or unlock varies due to how the valves are fitted on
the system. The direction to lock the valve is indicated with an arrow and a
lock symbol at each valve.
2
Open the two valve safety covers.
ÄKTA ready XL Operating Instructions 29281616 AE
Printed on: 15-09-2023 11:27:35 ***

Advertisement

Table of Contents
loading

Table of Contents