rious water leakage;
• Sufficiently illuminated (where required);
• Protected from frost and keep dry.
6.5

WALL FIXING

The product must be installed on a solid wall that is not subject
to vibrations. For securing choose the most suitable type of
expansion plug according to the specific wall type.
• Drill as shown in fig. 50.
fig. 50 - Drilling indication
• Hook the boiler with the special fastening bracket (fig. 51).
fig. 51 - Wall fixing
90 LT - 120 LT
300 mm
cod. 3540000400 - Rev. 03 - 09/2023
6.6

AERAULIC CONNECTIONS

In many images of this document
the position of the air ducts are
schematized at the top and bot-
ATTENZIONE
tom, in reality for the purposes
of correct installation we recom-
mend positioning the ducts side
by side (see fig. 52)
fig. 52– Arrangement of air channels
In addition to the spaces indicated in section 6.4, the heat pump
requires adequate air ventilation.
• Create a dedicated air duct as indicated in fig. 53.
fig. 53- Example of air outlet connection
Install each air duct making sure that:
>50cm