Installing primary and secondary risers

Prerequisites
Before you perform this procedure, make sure that you have the following items available:
The components included with the hardware option kit
T-10 Torx screwdriver
Procedure
1.
Power down the server.
Do one of the following:
2.
Disconnect each power cord from the power source.
Disconnect each power cord from the server.
Do one of the following:
3.
Installing primary and secondary risers
128